1Executive Summary3
2Property Overview4
3Legal & Title5
4Financial & Valuation6
5KYC & AML7
6Technical & Environmental8
7Contractual & Lease9
8Permits & Compliance10
9Commercial & Market11
10Risk Matrix12
14Document Register16
15Appendices17

1. Executive Summary

71/100Grade B
Investment Recommendation
DO NOT PROCEED

Critical red flags identified in legal, financial, or KYC areas. Investment carries unacceptable risk.

Action Required: Reject transaction or address critical issues before proceeding.

Strategic Summary

🔧
RED

What is the technical condition and what CAPEX can be expected?

The property shows mixed technical condition with significant maintenance requirements.

Critical issues include expired lift certifications for all three buildings (KONE elevators from 2002-2005, expired September 2023), severe Legionella contamination detected at up to 8,800 kve/l in De Wel 20 water systems, and major fire safety compliance deficiencies across all buildings requiring environmental permits.

Emergency lighting systems from 2016 require comprehensive battery replacement, and multiple gas installation certificates have expired.

However, recent improvements include new CV heating systems with dual Remeha boilers and successful remediation of some Legionella issues in De Wel 18 and 22-24.

The buildings achieve Energy Label A/A+ but fail to meet Renovatiestandaard requirements with consumption ranging from 140-198 kWh/m² versus required 80-93 kWh/m².

No specific CAPEX estimates are provided in the documents, requiring specialist assessment for lift modernization, water system remediation, fire safety upgrades, and energy efficiency improvements to meet 2050 sustainability requirements..

💰
RED

What is the financial standing of tenants and likelihood of lease renewal?

The tenant portfolio shows mixed financial stability with significant concentration risk.

Major tenants include GE Healthcare (€165,291 annual rent), OrbusNeich Medical (€130,635), Yourizon (€85,996), and Bubbelkoning (€84,976), representing substantial income concentration

GE Healthcare exercised partial early termination rights for 454 m² effective 2025, demonstrating tenant flexibility concerns.

House of Investing previously terminated due to crypto market volatility but extended after initial termination notice, indicating business model instability.

Emoena Projects operates at extremely low rent of €3.10/m² annually (€3,171 total), suggesting potential undervaluation or tenant accommodation

Security deposits total €182,947 across seven tenants, though Emoena Projects has no guarantee requirement

Several tenants operate as sole proprietorships or partnerships (REMATE, House of Investing V.O.F.), presenting higher credit risk than corporate entities.

The portfolio shows recent tenant turnover with multiple units vacant throughout 2023, particularly in De Wel 20 and 22, indicating potential leasing challenges..

🏢
RED

What opportunities exist for re-letting vacant space and what investments are required?

Significant vacancy existed throughout 2023 with multiple units vacant for 11 months in De Wel 20 and 1,676 m² vacant in De Wel 22.

Current vacancy includes units DEWE_03B and DEWE_03C totaling 842 in De Wel 18, representing approximately 30% of that building

The property benefits from mixed-use zoning allowing both office and business functions, providing flexibility for tenant attraction.

However, substantial investments are required before re-letting, including resolution of critical Legionella contamination (detected at 700-1,300 kve/l in some areas), lift certification updates for 20+ year old KONE elevators, and fire safety compliance upgrades requiring environmental permits.

Property handover inspections reveal multiple defects including broken washbasins, defective lighting, and required HVAC modifications for tenant fit-outs.

The buildings' location 40m from A1 motorway provides accessibility but may present noise concerns.

Energy efficiency improvements will be necessary to meet tenant sustainability requirements, as current consumption exceeds Renovatiestandaard by 60-113%

No specific investment costs are quantified in the documents, requiring specialist assessment for comprehensive building upgrades..

📋
AMBER

Does the zoning comply and/or what is possible within the zoning plan?

The property operates under zoning plan 'Bedrijventerrein Horstbeek 1997' with B3 business designation allowing mixed office and business use.

Original building permits from 2001 required correction from 'office buildings' to 'business buildings with office' to achieve zoning compliance, demonstrating the mixed-use flexibility.

Height exemptions were granted allowing 12m building height versus the standard 9m maximum, representing a 33% variance from base zoning requirements

The zoning permits 60% site coverage ratio, which appears to be met with current development

Additional bicycle/container storage facilities were approved in 2003 as ancillary structures complying with the zoning plan.

Current fire safety advisory plans for 2025 require municipal environmental permits (omgevingsvergunning bouwen) for building compartmentalization changes, indicating ongoing compliance requirements.

The B3 designation provides operational flexibility for both office and light business/industrial uses, supporting diverse tenant attraction strategies.

However, retail sales to consumers are restricted in some lease agreements, suggesting zoning limitations on direct retail activities.

The 1997 zoning plan may benefit from review for current market requirements and sustainability mandates..

🚪
AMBER

What is the exit strategy in the medium to long term?

The property demonstrates positive value appreciation with WOZ valuations increasing from €5,384,000 (2023) to €5,564,000 (2024), representing 3.3% annual growth

The 2019 acquisition price was €5,925,000, indicating current WOZ values remain below acquisition cost

The buildings' 2001 construction date positions them in the mid-life cycle for commercial properties, with 20+ years of operational history.

Strategic exit opportunities include portfolio sale to institutional investors seeking stabilized office assets, given the property's location in established business park Bedrijventerrein Horstbeek with A1 motorway access.

However, significant capital investment requirements for technical compliance (lift modernization, fire safety, Legionella remediation) and energy efficiency improvements to meet 2050 Renovatiestandaard may impact exit valuations.

The mixed-use zoning provides redevelopment optionality for alternative uses beyond traditional office.

Ownership structure through M7 EREIP V Lux Dutch Holdco S.à r.l.

suggests institutional ownership with potential for fund lifecycle exit strategies.

Market conditions for office properties will be influenced by post-pandemic workspace trends and sustainability requirements, requiring strategic timing for optimal exit execution..

AMBER

What value-add opportunities exist?

Multiple value-add opportunities exist despite required compliance investments.

Energy efficiency upgrades could achieve Renovatiestandaard compliance and attract sustainability-focused tenants, though current consumption of 140-198 kWh/m² significantly exceeds required 80-93 kWh/m².

The extremely low rent for Emoena Projects (€3.10/m² annually) suggests substantial rental upside potential upon lease renewal or re-letting

Installation of electric vehicle charging stations is planned for Q3/Q4 2024 under a 7-year exploitation agreement, adding tenant amenities and potential revenue streams.

The mixed-use B3 zoning allows diversification beyond traditional office use, potentially attracting light industrial or specialized business tenants.

Space optimization opportunities exist through reconfiguration of the 13 small units currently leased to Emoena Projects into larger, higher-value office suites.

Technology infrastructure improvements including fiber internet services (currently €304 monthly) could support premium office positioning

The property's proximity to A1 motorway provides logistics and accessibility advantages for business users.

However, significant capital investment is required for technical compliance before value-add initiatives can be fully realized, including lift modernization, water system upgrades, and fire safety improvements.

No specific investment costs or return projections are provided in the documents..

Key Statistics

510
Total Documents
262
AI Analyzed
329
🟢 Low Risk
126
🟡 Medium Risk
55
🔴 High Risk
55
Need Manual Review

Top 5 Critical Findings

#FindingCategoryImpact
1De Wel 18 excluded from 2025 assessment, suggesting potential separate ownershipFinancial & ValuationPortfolio may not be held by single entity, complicating acquisition
2Loss of significant tenant (GE Healthcare) reducing rental incomeContractual & LeaseImmediate vacancy of 454 m² resulting in lost rental income and re-letting costs
3Revenue impact from tenant departureContractual & LeaseLoss of rental income from May 2026, potential costs for property condition rectification
4Significant outstanding maintenance and restoration work from 2019 may still be incompleteTechnical & EnvironmentalPotential hidden maintenance costs and tenant disputes over property condition
5Tenant's business model appears volatile (crypto investments) and previously terminated due to market conditionsContractual & LeaseHigh risk of future payment defaults or early termination

Top 5 Recommendations

  1. Verify payment status of 2023 tax assessment
  2. Confirm no penalties applied for late payment
  3. Request tax clearance certificate
  4. Review detailed tax assessment calculations
  5. Update financial projections with new WOZ values

Financial Highlights

DocumentFindingValueRisk
woz-2023-aanslag-de-wel-18-22-hoevelaken.pdfWOZ 2023 assessment shows total property value of EUR 5,384,000 across four unitsEUR 5,384,000🟢 green
woz-2023-aanslag-de-wel-18-22-hoevelaken.pdfTotal 2023 municipal and water authority taxes due: EUR 13,895.57EUR 13,895.57🟡 amber
woz-2024-aanslag-de-wel-18-22-hoevelaken.pdfWOZ 2024 assessment shows increased total property value of EUR 5,564,000EUR 5,564,000🟢 green
woz-2024-aanslag-de-wel-18-22-hoevelaken.pdfProperty value increase of EUR 180,000 (3.3%) from 2023 to 2024EUR 180,000🟢 green
woz-2025-aanslag-de-wel-18-22-hoevelaken-gebruiker.pdf2025 user tax assessment issued to M7 EREIP V Lux Dutch Holdco S.a.r.l., indicating ownership structure changeEUR 6,679.54🟡 amber
bg-2021-transfer-of-rights-obligations-de-wel-18-22.pdfTransfer of bank guarantee obligations from Intesa Sanpaolo Bank Luxembourg S.A. Amsterdam branch to Intesa Sanpaolo SpA Amsterdam branchBank Guarantee No BG 81545/795🟡 amber
index-2025-emoena-projects.pdfAnnual rent indexation for Emoena Projects B.V. based on Dutch CPIEUR 3,376.86 (new annual rent)🟢 green
index-2025-emoena-projects.pdfService costs indexation applied separatelyEUR 1,875.32 (new annual service costs)🟢 green
index-2025-emoena-projects.pdfCPI indexation rate of 2.84% applied135.99/132.24 = 2.84% increase🟢 green
index-2025-emoena-projects.pdfMultiple units leased to single tenant13 separate units🟡 amber
index-2025-house-of-investing.pdfAnnual rent indexation for House of Investing V.O.F.EUR 9,978.35 (new annual rent)🟢 green
index-2025-house-of-investing.pdfService costs indexation appliedEUR 4,062.77 (new annual service costs)🟢 green
index-2025-house-of-investing.pdfCPI indexation rate of 2.94% applied135.69/131.82 = 2.94% increase🟢 green
index-2025-house-of-investing.pdfTenant operates from same address as propertyDe Wel 20, 3871 MV Hoevelaken🟢 green
index-2025-orbusneich.pdfMajor tenant OrbusNeich Medical B.V. with substantial annual rentEUR 127,011.17 (new annual rent)🟢 green
index-2025-orbusneich.pdfAdditional parking spaces included in leaseEUR 3,624.13 (new annual parking cost)🟢 green
index-2025-orbusneich.pdfCPI indexation rate of 3.55% applied132.26/127.73 = 3.55% increase🟡 amber
index-2025-orbusneich.pdfLargest revenue generating tenant in portfolioEUR 130,635.30 total annual payments🟡 amber
index-2025-remate.pdfAnnual rent indexation for REMATE tenant effective April 1, 2025EUR 5,103.10 (rent), EUR 404.09 (parking), EUR 2,170.55 (service costs)🟢 green
index-2025-remate.pdfCPI indexation applied using NL CPI 2015=100, December 2024 vs December 20234.09% increase (131.63/126.45)🟢 green
index-2025-yourizon.pdfAnnual rent indexation for Yourizon B.V. effective July 1, 2025EUR 81,698.89 (rent), EUR 4,297.00 (parking)🟢 green
index-2025-yourizon.pdfLargest tenant by rental income - significant revenue contributorEUR 85,995.89 total annual rent🟡 amber
index-2025-yourizon.pdfCPI indexation of 3.69% applied (March 2025 vs March 2024)3.69% increase (133.33/128.58)🟢 green
index-2026-bubbelkoning.pdfAnnual rent indexation for Bubbelkoning B.V. effective January 1, 2026EUR 82,399.71 (rent), EUR 2,576.33 (parking)🟢 green
index-2026-bubbelkoning.pdfAnother major tenant contributing significantly to rental incomeEUR 84,976.04 total annual rent🟡 amber
index-2026-bubbelkoning.pdfCPI indexation of 3.28% applied (September 2025 vs September 2024)3.28% increase (135.92/131.61)🟢 green
fct-dec-2025-emoena-projects.pdfMonthly rental income from Emoena Projects B.V. totaling €437.69 including rent and non-recoverable service costs€437.69🟢 green
fct-dec-2025-emoena-projects.pdfTenant occupies 13 units across the property (DEWE20_1-1 through DEWE20_1-15 plus DEWE20_BG-2)13 units🟡 amber
fct-dec-2025-house-of-investing.pdfMonthly rental income from House of Investing V.O.F. totaling €1,170.09 including rent and non-recoverable service costs€1,170.09🟢 green
fct-dec-2025-house-of-investing.pdfTenant is located at the same address as the property (De Wel 20, Hoevelaken), suggesting potential owner-occupancy or related party arrangementSame address occupancy🟡 amber
fct-dec-2025-remate.pdfMonthly rental income from REMATE totaling €639.81 including rent, parking, and non-recoverable service costs€639.81🟢 green
fct-dec-2025-remate.pdfTenant has parking spaces included in lease generating additional €33.67 monthly income€33.67🟢 green
fct-dec-2025-remate.pdfAutomatic direct debit arrangement in place for payment collectionDirect debit mandate🟢 green
fct-dec-2025-remate.pdfTenant operates as sole proprietorship (Eenmanszaak) which may indicate higher credit riskSole proprietorship🟡 amber
fct-jan-2026-emoena-projects.pdfMonthly rental income from Emoena Projects B.V. for multiple unitsEUR 437.69 total (EUR 281.41 rent + EUR 156.28 service costs)🟢 green
fct-jan-2026-emoena-projects.pdfTenant occupies 13 different units across the property13 units (DEWE20_1-1 through DEWE20_BG-2)🟡 amber
fct-jan-2026-emoena-projects.pdfZero VAT rate applied to rental income0% VAT🟢 green
fct-jan-2026-house-of-investing.pdfHighest rental income from House of Investing V.O.F. for single unitEUR 1,170.09 total (EUR 831.53 rent + EUR 338.56 service costs)🟢 green
fct-jan-2026-house-of-investing.pdfTenant located at De Wel 20, adjacent to the propertyDe Wel 20 address🟢 green
fct-jan-2026-house-of-investing.pdfPartnership structure tenant (V.O.F.)V.O.F. legal structure🟡 amber
fct-jan-2026-remate.pdfRental income including parking spaces from sole proprietorshipEUR 639.81 total (EUR 425.26 rent + EUR 33.67 parking + EUR 180.88 service costs)🟢 green
fct-jan-2026-remate.pdfParking revenue component identifiedEUR 33.67 monthly parking income🟢 green
fct-jan-2026-remate.pdfDirect debit payment arrangement in placeAutomatic payment via direct debit🟢 green
fct-jan-2026-remate.pdfSole proprietorship business structureEenmanszaak (sole proprietorship)🟡 amber
fct-q1-2026-bubbelkoning.pdfQ1 2026 rental invoice for Bubbelkoning B.V. tenant showing quarterly rent of €20,599.93€20,599.93🟢 green
fct-q1-2026-bubbelkoning.pdfTotal quarterly charges including energy, service costs and parking: €28,619.01€28,619.01🟢 green
fct-q1-2026-bubbelkoning.pdfAll charges are 0% VAT rated indicating VAT exempt status0% VAT🟢 green
fct-q1-2026-ge-healthcare.pdfQ1 2026 rental invoice for GE Healthcare B.V. showing quarterly rent of €38,340.77€38,340.77🟢 green
fct-q1-2026-ge-healthcare.pdfLargest tenant with total quarterly charges of €58,947.83 including significant parking allocation€58,947.83🟢 green
fct-q1-2026-orbusneich.pdfQ1 2026 rental invoice for OrbusNeich Medical B.V. showing quarterly rent of €31,752.79€31,752.79🟢 green
fct-q1-2026-orbusneich.pdfTotal quarterly charges of €45,708.82 with manual payment terms instead of direct debit€45,708.82🟡 amber
fct-q1-2026-yourizon.pdfQuarterly rent invoice for Yourizon B.V. showing €20,424.72 quarterly base rent€28,498.97 total quarterly charge🟢 green
fct-q1-2026-yourizon.pdf0% VAT applied on all charges indicating potential VAT-exempt status€0.00 VAT on €28,498.97🟡 amber
fct-q4-2025-bubbelkoning.pdfQuarterly rent invoice for Bubbelkoning B.V. showing €19,946.71 quarterly base rent€27,495.37 total quarterly charge🟢 green
fct-q4-2025-bubbelkoning.pdf0% VAT applied on all charges consistent with other tenant invoices€0.00 VAT on €27,495.37🟡 amber
fct-q4-2025-bubbelkoning.pdfLower parking costs compared to other tenants suggesting smaller allocation€623.66 quarterly parking🟢 green
fct-q4-2025-ge-healthcare.pdfGE Healthcare B.V. is the largest tenant with €37,125.00 quarterly base rent€56,002.50 total quarterly charge🟢 green
fct-q4-2025-ge-healthcare.pdfLargest parking allocation with €2,887.50 quarterly indicating significant space usage€2,887.50🟢 green
fct-q4-2025-orbusneich.pdfQuarterly rental invoice for OrbusNeich Medical B.V. showing rent €31,752.79, parking €906.03, service costs €12,390.0045048.82🟢 green
fct-q4-2025-orbusneich.pdfZero-rated VAT indicating exempt commercial lease under Dutch VAT rules0🟢 green
fct-q4-2025-yourizon.pdfQuarterly rental invoice for Yourizon B.V. showing rent €20,424.72, parking €1,074.25, energy advance €3,625.00, service costs €2,350.0027473.97🟢 green
fct-2023-afrek-sk-de-wel-18-22-hoevelaken-2.pdfService charge credit of €6,861.69 for OrbusNeich Medical B.V. for 2023€6,861.69🟢 green
fct-2023-afrek-sk-de-wel-18-22-hoevelaken-2.pdfTotal building area: 2,915 m²2,915 m²🟢 green
fct-2023-afrek-sk-de-wel-18-22-hoevelaken-2.pdfTenant occupied 1,239 m² from 2023-11-01 to 2023-12-31 (61 days)1,239 m²🟡 amber
fct-2023-afrek-sk-de-wel-18-22-hoevelaken-2.pdfService charge rate €17.25 per m² for 2023€17.25/m²🟢 green
fct-2023-afrek-sk-de-wel-18-22-hoevelaken-3.pdfSignificant vacant space service charge credit of €17,175.80 for owner in 2023€17,175.80🔴 red
fct-2023-afrek-sk-de-wel-18-22-hoevelaken-3.pdfBuilding area 2,796.57 m² with vacant unit DEWE_03B of 234.47 m²234.47 m²🟡 amber
fct-2023-afrek-sk-de-wel-18-22-hoevelaken-3.pdfTotal service costs €78,314.24 for building in 2023€78,314.24🟢 green
fct-2023-afrek-sk-de-wel-18-22-hoevelaken-3.pdfService charge rate €28.00 per m² for owner/vacant areas€28.00/m²🟡 amber
fct-2023-afrek-sk-de-wel-18-22-hoevelaken-3.pdfVacancy rate approximately 8.4% of total building area8.4%🟡 amber
fct-2023-afrek-sk-de-wel-18-22-hoevelaken.pdfService charge reconciliation 2023 showing total costs €119,911.53 vs €69,744.01 in 2022119911.53🟡 amber
fct-2023-afrek-sk-de-wel-18-22-hoevelaken.pdfService charge capping mechanism applied (€2,228.97)2228.97🟢 green
fct-2023-afrek-sk-de-wel-18-22-hoevelaken.pdfBuilding area confirmed at 2,821 sqm2821🟢 green
fct-2023-afrek-sk-de-wel-18-22-hoevelaken.pdfSignificant vacancy reconciliation charges totaling €939.58939.58🟡 amber
lijst-2023-afrek-sk-de-wel-18-hoevelaken.pdfGE Healthcare B.V. service charge credit of €13,231.86-13231.86🟢 green
lijst-2023-afrek-sk-de-wel-18-hoevelaken.pdfBaker Hughes Energy service charge credits totaling €5,935.04-5935.04🟢 green
lijst-2023-afrek-sk-de-wel-18-hoevelaken.pdfTotal tenant service charge credits €19,166.90 vs owner charges €17,175.80-36342.70🟢 green
lijst-2023-afrek-sk-de-wel-20-hoevelaken.pdfBubbelkoning B.V. service charge of €4,971.344971.34🟡 amber
lijst-2023-afrek-sk-de-wel-20-hoevelaken.pdfYourizon B.V. service charge of €4,709.204709.20🟡 amber
lijst-2023-afrek-sk-de-wel-20-hoevelaken.pdfService charge capping applied €2,228.972228.97🟢 green
lijst-2023-afrek-sk-de-wel-20-hoevelaken.pdfNet service charge balance €12,352.7212352.72🟢 green
lijst-2023-afrek-sk-de-wel-22-hoevelaken.pdfService charge reconciliation showing negative adjustments totaling EUR -30,087.23-30087.23🟡 amber
lijst-2023-afrek-sk-de-wel-22-hoevelaken.pdfSignificant vacant space service charge adjustments (EUR -23,225.54)-23225.54🔴 red
lijst-2023-afrek-sk-de-wel-18-hoevelaken.xlsxService charge settlement for 2023 across multiple tenantsTotal area 2,796.57 m²🟢 green
lijst-2023-afrek-sk-de-wel-18-hoevelaken.xlsxVacancy in units DEWE_03B and DEWE_03C842.47 m² vacant (30.1% of total)🟡 amber
lijst-2023-afrek-sk-de-wel-18-hoevelaken.xlsxMajor tenant GE Healthcare occupies significant space1,686.1 m² (60.3% of total area)🟡 amber
lijst-2024-afrek-sk-de-wel-18-hoevelaken.xlsxService charge settlement for De Wel 18-24 building for 20242,796.57 m² total area🟢 green
lijst-2024-afrek-sk-de-wel-18-hoevelaken.xlsxSignificant vacancy - 2 out of 6 units vacant842.47 m² vacant space🟡 amber
lijst-2024-afrek-sk-de-wel-18-hoevelaken.xlsxMajor tenant GE Healthcare occupies significant portion1,686.1 m² (60% of building)🟡 amber
lijst-2024-afrek-sk-de-wel-18-hoevelaken.xlsxBaker Hughes has multiple units268 m² total (217+51)🟢 green
lijst-2024-afrek-sk-de-wel-20-hoevelaken.xlsxMultiple small tenants in De Wel 20 building with high tenant turnover25+ tenant units identified🟡 amber
lijst-2024-afrek-sk-de-wel-20-hoevelaken.xlsxSignificant tenant concentration with Emoena Projects B.V.Multiple units occupied by single entity🔴 red
lijst-2024-afrek-sk-de-wel-20-hoevelaken.xlsxMultiple lease terminations during 2024Several units became vacant mid-year🔴 red
lijst-2024-afrek-sk-de-wel-20-hoevelaken.xlsxHigh vacancy rate with multiple vacant unitsMultiple vacant units throughout 2024🔴 red
lijst-2024-afrek-sk-de-wel-22-hoevelaken.xlsxSingle tenant building with high vacancy risk2,915 m² total building area🔴 red
lijst-2024-afrek-sk-de-wel-22-hoevelaken.xlsxOrbusNeich Medical B.V. occupies only portion of building1,239 m² occupied (42.5% of total)🟡 amber
lijst-2024-afrek-sk-de-wel-22-hoevelaken.xlsxSignificant vacant space throughout 20241,676 m² vacant (57.5% of building)🔴 red

Technical Concerns

DocumentConcernRisk
pvo-2019-start-huur-ge-healthcare-de-wel-18.pdfDocument is 5+ years old with multiple outstanding technical issues that may not have been resolved. Current building condition uncertain.🟡 amber
pvo-start-huur-bubbelkoning-de-wel-20-hoevelaken.pdfWhile the handover process was properly documented, the number of defects and required modifications suggests potential ongoing maintenance issues that could affect the property's condition and value.🟡 amber
pvo-start-huur-emoena-projects-de-wel-20-hoevelaken.pdfDate discrepancy between lease start and handover creates contractual uncertainty that should be resolved🟡 amber
pvo-start-huur-orbusneich-hoevelaken.pdfProperty handover completed but with known defects and access issues that could create operational problems and tenant disputes. Technical renovation requirements add complexity.🟡 amber
lijst-1.PDFEmergency lighting system is significantly outdated (2016) and requires comprehensive maintenance. This creates immediate fire safety compliance risks.🔴 red
tek-2025-clarke-brandcomp-advies-nr-18.pdfFire safety plans are in advisory status and require municipal approval via building permit. This creates uncertainty around current compliance status and potential implementation requirements.🟡 amber
tek-2025-clarke-brandcomp-advies-nr-20.pdfFire safety plans are in advisory status and require municipal approval via building permit. This creates uncertainty around current compliance status and potential implementation requirements.🟡 amber
tek-2025-clarke-brandcomp-vergund-2001-nr-18.pdfOriginal fire safety permits from 2001 may not comply with current regulations. The 24-year gap suggests significant regulatory changes may require compliance updates, as evidenced by the 2025 advisory plans.🟡 amber
epc-energielabel-de-wel-18-te-hoevelaken.pdfWhile the building has a good A+ energy label, it does not meet future sustainability standards (Renovatiestandaard) and relies entirely on fossil fuels with no renewable energy sources. This presents medium-term compliance and cost risks.🟡 amber
epc-energielabel-de-wel-20-te-hoevelaken.pdfBuilding has good A energy label but worse energy performance than adjacent building De Wel 18. Significant gap to meet Renovatiestandaard requirements and complete reliance on fossil fuels presents compliance and cost risks.🟡 amber
epc-energielabel-de-wel-22-te-hoevelaken.pdfBest performing building of the three with A+ label and lowest energy consumption, but still requires significant improvements to meet future sustainability standards. Pure office use provides operational simplicity.🟡 amber
nen2580-2024-meetrapport-de-wel-18-hoevelaken.pdfRecent and compliant measurement but Type B certificate provides lower accuracy than Type A certificates for other buildings in the portfolio. Different measurement provider may indicate inconsistent standards.🟡 amber
bodem-2017-historisch-bodemonderzoek-de-wel-18-24.pdfElevated contamination levels and outdated assessment create moderate environmental risk requiring updated evaluation🟡 amber
legio-2024-herkeuring-keerkleppen-de-wel-20.pdfWhile majority of backflow prevention systems are compliant, one device removal requires verification for continued regulatory compliance🟡 amber
legio-2024-keerklepcontrole-de-wel-18.pdfSignificant non-compliance with water safety regulations, 52% failure rate on backflow prevention devices🔴 red
legio-2024-keerklepcontrole-de-wel-20.pdfHighest failure rate (71%) across the portfolio with critical fire safety and regulatory compliance issues🔴 red
legio-2024-keerklepcontrole-de-wel-22-24.pdfCritical water safety compliance failure with 55% of backflow prevention devices non-compliant. This represents immediate regulatory and health risks that require urgent remediation.🔴 red
legio-2024-wateronderzoek-tl77034-de-wel-20.pdfCritical Legionella contamination at dangerous levels (88x above safe limits) poses immediate health risks and regulatory compliance issues.🔴 red
legio-2024-wateronderzoek-tl77036-de-wel-22-24.pdfSerious Legionella contamination at 23 times safe levels creates immediate health risks and regulatory compliance issues requiring urgent remediation.🔴 red
legio-2024-wateronderzoek-tl80475-de-wel-20.pdfSignificant Legionella contamination detected at levels 4-13x above safety standards across multiple water points, creating serious health and safety risks.🔴 red
legio-2025-wateronderzoek-tl83187-de-wel-20.pdfLegionella contamination detected at one sampling point with levels 5x above safe threshold, requiring immediate remediation and ongoing monitoring🟡 amber
legio-2025-wateronderzoek-tl83633-de-wel-20.pdfCritical Legionella contamination at 7x safe levels with increasing trend, requiring immediate facility shutdown and emergency remediation🔴 red
milieu-2019-ambiente-environm-sum-de-wel-18-24.pdfEnvironmental assessment is outdated (2019) and property's proximity to major highway raises ongoing environmental concerns that need current assessment🟡 amber
ohc-easy-office-online-abonnement-glasvezel-2021-08-10.pdfContract from 2021 may be expired, requiring verification of current service status and potential renewal🟡 amber
ohc-homij-oh-w-installaties-2023-12-22.pdfWhile the maintenance contract is properly structured, the out-of-service cooling system and price escalation clauses present moderate risks that require attention🟡 amber
ohc-leertouwer-gewijzigd-contract-2024-12-02.pdfCritical fire safety system maintenance contract with appropriate terms but contains restrictions that may limit operational flexibility🟡 amber
ohc-leertouwer-onderhoud-bmi-insp-2021-03-15.pdfContract appears incomplete with service options not yet selected, creating uncertainty about service levels and costs.🟡 amber
ohc-leertouwer-onderhoud-bmi-insp-geb-b-2021-03-15.pdfContract is significantly incomplete with urgent handwritten notes indicating critical service options remain unspecified, creating operational and financial uncertainty.🔴 red
ohc-leertouwer-uitbreiding-wijziging-2024-11-11.pdfContract proposal may have expired creating potential maintenance coverage gap🟡 amber
ohc-liander-elektra-2019-04-08.pdfActive electricity connection but contract terms reference outdated 2019 tariffs🟡 amber
ohc-trigion-abonn-meldkamer-bmi-alarm-2020-11-07.pdfEssential safety service with potential compliance implications if not properly maintained🟡 amber
ohc-van-venrooy-dakinspectie-20-2025-01-17.pdfRoutine maintenance contract with potential for discovering deferred maintenance requiring additional investment🟡 amber
ohc-van-venrooy-dakinspectie-nr-18-2025-01-17.pdfWhile the maintenance contract appears comprehensive, contractor liability limitations and unknown deferred maintenance costs present moderate risks🟡 amber
ohc-van-venrooy-dakinspectie-nr-22-24-2025-01-17.pdfIdentical contract terms and risks as Building C, with same contractor liability limitations and unknown deferred maintenance exposure🟡 amber
cert-2019-scioa-bvn-aaa-24-de-wel-18.pdfCritical safety compliance issue with overdue mandatory gas line inspection, creating legal and operational risks🔴 red
cert-2019-scios-abd655-rap-de-wel-18.pdfWhile heating system is certified and operational, identified safety issue with flue gas connections requires immediate attention to maintain compliance🟡 amber
cert-2019-scios-abd657-rap-de-wel-22-24.pdfWhile system is certified, history of CO issues and lack of comprehensive manufacturer service indicate higher risk requiring immediate attention🟡 amber
cert-2019-scios-bvn-aaa-19-de-wel-22-24 (1).pdfCritical safety certificate has expired (2023-08-23), creating immediate compliance and operational risk🔴 red
cert-2019-scios-bvn-aaa-19-de-wel-22-24.pdfCritical gas installation certificate expired, affecting major tenant operations and building safety compliance🔴 red
cert-2019-scios-bvn-aaa-24-de-wel-18.pdfCritical safety certificate expired for GE Healthcare facility, creating immediate compliance risk🔴 red
cert-2019-scios-bxu-aaa-40-de-wel-20.pdfWhile the gas installation is currently certified and safe, there are upcoming compliance requirements and minor safety improvements needed🟡 amber
cert-2020-liftinstallatie-100300320-de-wel-20.pdfLift certification has expired, creating immediate compliance and operational risks🔴 red
cert-2020-liftinstallatie-387101601-de-wel-18.pdfLift certification expired and asset is 22 years old, creating significant compliance and operational risks🔴 red
cert-2020-liftinstallatie-387102001-de-wel-22-24.pdfLift certification expired and asset is 21 years old, creating significant compliance and operational risks🔴 red
cert-2020-scios-abd656-de-wel-20.pdfCritical compliance failure - periodic inspection expired October 2023, now overdue by significant period. This creates legal and operational risk for the building's heating system.🔴 red
cert-2022-liftinstallatie-100300320-de-wel-20.pdfElevator inspection certificate expired September 2023, creating immediate legal and safety compliance issue. Building access may be impacted.🔴 red
cert-2022-liftinstallatie-387101601-de-wel-18.pdfElevator inspection certificate expired September 2023 and equipment is 22 years old, creating both immediate compliance issues and significant capital expenditure risk for replacement.🔴 red
cert-2024-liftinstallatie-387101601-de-wel.pdfWhile lift is certified and compliant, it is 22 years old which presents aging equipment risk and potential future capex requirements🟡 amber
cert-2025-liftinstallatie-100300320-de-wel-20.pdfWhile lift is certified and compliant, it is 20 years old which may indicate higher maintenance requirements and potential replacement needs🟡 amber
cert-2025-liftinstallatie-387102001-de-wel-22-24.pdfLift is 22 years old, significantly exceeding typical expected service life, presenting high risk for maintenance costs and potential failure🔴 red
fct-2020-ftc-brandveiligheid-de-wel-18-22 (1).pdfFire safety assessment is 5 years old and may not reflect current compliance status; involves multiple buildings requiring comprehensive fire safety verification🟡 amber
lijst-overig-de-wel-looplijst-noodverlichting.pdfEmergency lighting system from 2016 likely overdue for mandatory battery replacement, creating safety and compliance risks🔴 red
pva-2025-clarke-brandveiligheid-de-wel-18.pdfFire safety assessment reveals multiple deficiencies requiring remediation. While not immediately critical, these issues need addressing for full regulatory compliance and building safety.🟡 amber
pva-2025-clarke-brandveiligheid-de-wel-20.pdfFire safety assessment reveals multiple deficiencies requiring remediation. While not immediately critical, these issues need addressing for full regulatory compliance and building safety.🟡 amber
pva-2025-clarke-brandveiligheid-de-wel-22-24.pdfFire safety assessment reveals multiple deficiencies requiring remediation. While not immediately critical, these issues need addressing for full regulatory compliance and building safety. This building has slightly larger floor area (2875m2 vs 2775m2) which may indicate more extensive remediation requirements.🟡 amber
rap-2015-all-install-onderhoud-lbk-de-wel-18.pdfHVAC maintenance records are significantly outdated (2015). This raises concerns about current system condition, energy efficiency, and potential tenant satisfaction issues.🔴 red
rap-2015-all-install-onderhoud-stookinstallatie-de-wel-18.pdfCritical building systems (heating/boiler) maintenance records are significantly outdated (2015). Environmental compliance certificates may be expired, creating regulatory and operational risks.🔴 red
rap-2015-all-install-onderhoud-stookinstallatie-de-wel-20.pdfWhile the 2015 maintenance showed good condition, the report is 9 years old and current system status is unknown🟡 amber
rap-2015-all-install-onderhoud-stookinstallatie-de-wel-22-24.pdfWhile the 2015 maintenance showed good condition, the report is 9 years old and current system status is unknown🟡 amber
rap-2015-inspectie-onderhoudslijst-lbk-de-wel-2.pdfHVAC system maintenance is critically outdated (2015) which may impact air quality, energy efficiency, and tenant comfort🟡 amber
rap-2015-onderhoud-bmi-oai.pdfCritical fire safety deficiencies pose regulatory compliance and life safety risks🔴 red
rap-2016-veritas-nen3140-inspectie-de-wel-18-24.pdfCritical risk due to significantly outdated electrical inspection (2016) with next inspection overdue since 2019, creating potential safety, compliance, and insurance issues🔴 red
rap-2017-all-install-onderhoud-lbk-de-wel-18.pdfWhile maintenance was completed satisfactorily, the 13-month gap between services is concerning for optimal system performance🟡 amber
rap-2017-all-install-onderhoud-lbk-de-wel-22-24.pdfSimilar maintenance gap issue as De Wel 18, indicating potential systematic maintenance scheduling problems🟡 amber
rap-2017-all-install-onderhoud-stookinstallatie-de-wel-18.pdfWhile the 2017 report shows good system condition, the 7+ year age creates significant uncertainty about current system status and compliance🔴 red
rap-2017-all-install-onderhoud-stookinstallatie-de-wel-20.pdfWhile the 2017 maintenance report shows good system condition, the age of the report raises concerns about current compliance status🟡 amber
rap-2017-all-install-onderhoud-stookinstallatie-de-wel-22-24.pdfWhile the 2017 maintenance report shows good system condition, the age of the report raises concerns about current compliance status🟡 amber
rap-2017-blusmiddelen-de-wel-18.pdfCritical fire safety compliance gap - inspection from 2018 is significantly outdated and may not meet current regulatory requirements🔴 red
rap-2017-onderhoud-brandblussers-de-wel-18-2.pdfWhile current fire safety compliance is good, some equipment is aging and may require replacement planning🟡 amber
rap-2017-onderhoud-brandblussers-de-wel-18-24.pdfCurrent compliance is satisfactory but significant portion of fire safety equipment is approaching end of useful life🟡 amber
rap-2017-onderhoud-brandblussers-de-wel-22-24.pdfWhile fire safety equipment was properly maintained in 2017, the report is now 7+ years old and current compliance status is unknown🟡 amber
rap-2017-vitens-gebreken-drinkwaterinstallatie-de-wel-20.pdfCritical water safety defects were identified in 2017 with elevated risk status. Current compliance status unknown.🔴 red
rap-2017-vitens-gebreken-drinkwaterinstallatie-de-wel-22-24.pdfCritical water safety defects were identified in 2017 with elevated risk status. Current compliance status unknown.🔴 red
rap-2018-blusmiddelen-de-wel-22-24.pdfWhile majority of fire safety equipment passed inspection, one critical failure in server area creates fire safety risk. Maintenance gaps also indicate potential compliance issues.🟡 amber
rap-2018-leertouwer-nen3140-de-wel-18.pdfAging electrical infrastructure (15+ years) with unknown modification history presents moderate technical risk. Professional inspection conducted but age-related concerns remain.🟡 amber
rap-2018-leertouwer-onderhoud-de-wel-20.pdfMultiple critical fire safety compliance failures in vacant building, including non-compliant alarm systems, missing fire safety management, and inadequate emergency evacuation capabilities. Significant liability and insurance risks.🔴 red
rap-2018-leertouwer-veiligheidinspectie-de-wel-18.pdfWhile the electrical inspection appears compliant, the age of the installation (2003) and unknown modification dates raise concerns about current compliance and maintenance status🟡 amber
rap-2020-ign-leegstand-1-nen3140-de-wel-18-24.pdfCritical electrical safety issues with zero remediation progress, creating significant safety, legal and insurance risks🔴 red
rap-2020-ign-leegstand-2-nen3140-de-wel-18-24.pdfMultiple electrical deficiencies requiring remedial action, though no immediate safety hazards. Non-compliance with current standards creates regulatory and insurance risks.🟡 amber
rap-2020-koelplan-onderhoud-lbk-de-wel-18-24.pdfWhile F-gas compliance is maintained, multiple HVAC systems have significant technical issues requiring immediate attention. One system has critical failures affecting operational capability.🟡 amber
rap-2020-leertouwer-onderhoud-bmi-de-wel-18.pdfDespite functional fire alarm systems, the locked emergency exit doors create a critical life safety hazard that requires immediate remediation.🔴 red
rap-2020-leertouwer-onderhoud-bmi-de-wel-20.pdfWhile the fire detection system is generally functional, several deficiencies including non-functioning secondary indicators, inadequate sound levels, and missing documentation create moderate safety risks that require attention🟡 amber
rap-2020-leertouwer-veiligheidsinspectie-de-wel-22-24.pdfElectrical safety inspection report from 2021 indicates potential defects in the electrical installation. The classification system suggests varying levels of risk that may require immediate or urgent attention.🟡 amber
rap-2020-liftinstallatie-100300320-de-wel-20-2.pdfCritical safety defects identified in lift inspection including faulty door locking mechanism and missing brake control provision, creating serious safety risks and potential liability exposure.🔴 red
rap-2020-liftinstallatie-100300320-de-wel-20.pdfIdentical to previous document - same critical safety defects apply regarding shaft door locking and missing brake control provision.🔴 red
rap-2020-liftinstallatie-387101601-de-wel-18.pdfWhile lift is certified and operational, missing brake control system represents safety and compliance concern requiring future capex investment🟡 amber
rap-2020-liftinstallatie-387102001-de-wel-22-24-2.pdfWhile lift is certified and operational, missing brake control system represents safety and compliance concern requiring future capex investment🟡 amber
rap-2020-liftinstallatie-387102001-de-wel-22-24.pdfWhile lift is certified and operational, missing brake control system represents safety and compliance concern requiring future capex investment🟡 amber
rap-2020-oh-bmi-de-wel-20.pdfMultiple fire safety system deficiencies and missing documentation create regulatory compliance risks🟡 amber
rap-2021-energielive-monitoringsdienst-elektra-de-wel-20.pdfCritical electrical capacity exceedance and dramatic consumption increase pose operational and financial risks🔴 red
rap-2021-leertouwer-onderhoud-bmi-de-wel-18.pdfFire safety system has defective components and outdated projections due to room usage changes, creating potential safety risks🟡 amber
rap-2021-leertouwer-onderhoud-bmi-de-wel-20.pdfIncomplete fire alarm system inspection due to inaccessible rooms creates unknown safety risks and potential compliance violations🔴 red
rap-2021-leertouwer-veiligheidsinspectie-de-wel-20.pdfElectrical safety inspection document indicates structured defect classification system suggesting potential electrical safety issues requiring attention🟡 amber
rap-2021-leertouwer-veiligheidsinspectie-de-wel-22-24.pdfDocument is truncated and does not show actual inspection results or defect classifications, creating uncertainty about electrical safety status🟡 amber
rap-2022-leertouwer-veiligheidsinspectie-de-wel-18.pdfDocument is truncated and does not show actual inspection results, while healthcare tenant may require higher electrical safety standards🟡 amber
rap-2022-liftinstallatie-100300320-de-wel-20.pdfElevator approved but has safety deficiency requiring attention - missing brake control device poses elevated safety risk🟡 amber
rap-2022-liftinstallatie-387101601-2022-03-18.pdfMultiple maintenance deficiencies identified including foreign materials and insufficient lubrication, indicating substandard maintenance practices🟡 amber
rap-2022-liftinstallatie-387101601-de-wel-18.pdfWhile lift is certified and approved, missing brake control system presents safety risk requiring attention🟡 amber
rap-2022-rrs-rioolinspectie-de-wel-20.pdfPlumbing issues requiring toilet replacement and potential additional cleaning work🟡 amber
rap-2023-arepa-nen3140-de-wel-20.pdfElectrical defects present safety and compliance risks that require prompt attention. While not critical, the serious classification defects need immediate remediation.🟡 amber
rap-2023-leertouwer-nen-3140-de-wel-20.pdfDuplicate report confirming electrical defects requiring remediation🟡 amber
rap-2023-leertouwer-onderhoud-bmi-de-wel-18.pdfCritical life safety issue with locked evacuation doors on 2nd floor creates immediate risk to occupants. Additional fire safety maintenance issues compound the risk.🔴 red
rap-2023-toetsingskader-eml-de-wel-18.pdfEnvironmental assessment report is unreadable, preventing proper evaluation of contamination risks which is critical for commercial real estate acquisition🟡 amber
rap-2023-vitens-beperkte-risico-de-wel-20.pdfMultiple technical deficiencies identified in water and fire safety systems requiring immediate attention to ensure compliance and safety🟡 amber
rap-2024-arepa-nen3140-de-wel-18.pdfCritical electrical safety defects identified requiring immediate remediation before property can be safely operated🔴 red
rap-2024-arepa-nen3140-de-wel-20.pdfMultiple electrical safety deficiencies identified requiring remediation, though no critical issues present. Incomplete inspection due to access issues.🟡 amber
rap-2024-arepa-nen3140-de-wel-22-24.pdfMultiple electrical safety deficiencies identified requiring remediation, though no critical issues present.🟡 amber
rap-2025-energysafe-q1-de-wel-18.pdfWhile energy label is excellent (A+), there are concerning operational issues with HVAC system including night-time gas consumption and inefficient operation during warm weather, plus incomplete historical data🟡 amber
rap-2025-energysafe-q1-de-wel-22-24.pdfDespite excellent energy label (A+), there are serious operational issues including defective CV system requiring temporary electric heating, potential air handling unit misconfiguration, and high baseline electrical load indicating system inefficiencies🔴 red
rap-2025-eurosafe-rie-rapportage-de-wel-22-24.pdfWhile safety assessment is comprehensive, ongoing maintenance obligations and safety compliance requirements present moderate risk🟡 amber
rap-2025-leertouwer-oh-bmi-de-wel-18.pdfCritical fire safety deficiencies pose immediate life safety risks and regulatory compliance issues that must be resolved before acquisition completion🔴 red
rap-2025-leertouwer-oh-bmi-de-wel-20.pdfCritical fire safety violation with emergency exit blockage poses immediate life safety risk and regulatory non-compliance. Combined with impaired fire detection system creates unacceptable risk profile.🔴 red
rap-2025-leertouwer-oh-bmi-de-wel-22-24.pdfCritical fire safety deficiency prevents safe occupation of 2nd floor offices. Missing smoke detectors in area with converging escape routes creates unacceptable life safety risk.🔴 red
rap-2025-liftinstallatie-100300320-de-wel-20.pdfOverall elevator condition is acceptable but several components need attention to prevent future issues. Regular maintenance appears to be functioning well with 4 annual service visits.🟡 amber
rap-2025-venrooy-dakinspectie-de-wel-18.pdfMultiple serious roof defects requiring immediate repair, creating significant capex obligations🔴 red
rap-2025-venrooy-dakinspectie-de-wel-20.pdfMultiple critical roof components scored 4 (poor condition), particularly drainage systems which pose immediate water damage risk. Building constructed in 2002, now 23 years old showing significant deterioration.🔴 red
rap-2025-venrooy-dakinspectie-de-wel-22-24.pdfMultiple roof sections with critical condition scores of 4, particularly drainage systems and edge work. Large total roof area (678 sqm) amplifies maintenance costs and risks. Building age of 23 years showing systematic deterioration.🔴 red
tek-202-eurosafe-rie-rapportage-de-wel-20.pdfRoof safety assessment identifies significant fall risks requiring immediate attention, but standard for commercial properties🟡 amber
tek-2025-eurosafe-rie-rapportage-de-wel-18.pdfRoof safety assessment identifies significant fall risks requiring immediate attention, but standard for commercial properties🟡 amber

Legal Issues

DocumentIssueRisk
kad-2025-eigendomsinformatie-c-5586-de-wel-18-22.pdf
kad-2025-eigendomsinformatie-c-5587-de-wel-18-22.pdf
kad-2025-eigendomsinformatie-c-5588-de-wel-18-22.pdf
kad-2025-kaart-c-5586-de-wel-18-22.pdf
kad-2025-kaart-c-5587-de-wel-18-22.pdf
kad-2025-kaart-c-5588-de-wel-18-22.pdf
akte-2019-akte-van-levering-de-wel-18-22-hoevelaken.pdf

2. Property Overview

Property Details

AddressVesper AI Demo Report
TypeMulti-tenant commercial
BuildingsBuilding A, Building B, Building C

Transaction Context

ClientIlivium Life B.V.
Seller EntityM7 EREIP V Dutch PropCo 5 B.V.
Report DateMarch 2026
KYC StatusNo KYC documents found

Data Room Summary

CategoryDocuments🟢 Green🟡 Amber🔴 RedScore
⚖️ Legal & Title1147075
💰 Financial & Valuation341019566
🔍 KYC & AML000085
🏗️ Technical & Environmental330211744580
📋 Contractual & Lease331316471
🏛️ Permits & Compliance14310166
📊 Commercial & Market000085
Total5103291265571

3. ⚖️ Legal & Title

75/100Grade B
11 documents analyzedWeight: 30%

This category received a score of 75/100 based on the analysis of 11 documents. 7 medium-risk items warrant further review.

Checklist Progress

10/10 items covered
Title deed verification & ownership chain
Corporate structure / SPV documentation
Historical title issues
UBO identification & verification
Easements & rights of way
Zoning / land use designation
Current valuation / appraisal
Transfer tax implications
Power of attorney / signing authority
Lease agreements review (if applicable)

Key Findings

FindingSeverityValue/Impact
Clear title ownership registered to M7 EREIP V Lux Dutch Holdco S.à r.l.🟢 green€5,925,000
Property acquired in 2019 for €5.925.000 as part of larger transaction🟢 green€5,925,000
Cadastral fusion occurred in 2023 from original parcel C 4161🟡 amber
Clear title ownership registered to M7 EREIP V Lux Dutch Holdco S.à r.l.🟢 green€5,925,000
Multiple BAG identifications indicating mixed-use property🟢 green
Cadastral fusion from original parcel C 4161 in 2023🟡 amber
Clear title ownership registered to M7 EREIP V Lux Dutch Holdco S.à r.l.🟢 green€5,925,000
Owner address updated to Luxembourg registration🟡 amber
Largest parcel of the three with 3,491 m²🟢 green3,491 m²
Cadastral map for parcel C-5586 in Hoevelaken showing established and provisional boundaries🟡 amber
Map scale 1:500 with disclaimer that reliable measurements cannot be derived🟡 amber
Shows building structures on the cadastral parcel🟢 green
Cadastral map for parcel C-5587 in Hoevelaken showing established and provisional boundaries🟡 amber
Map scale 1:500 with disclaimer that reliable measurements cannot be derived🟡 amber
Shows building structures on the cadastral parcel🟢 green

Showing 15 of 27 findings.

Risk Flags

🟡 Legal RiskAMBER

Cadastral fusion in 2023 may require additional verification of boundaries and rights

Impact: Potential boundary disputes or unclear property delineation

Mitigation: Request detailed fusion documentation and updated cadastral maps

🟡 KYC RiskAMBER

Inconsistent registered address for owner entity

Impact: May indicate corporate structure changes or compliance issues

Mitigation: Verify current registered address and corporate status

🟡 Legal RiskAMBER

Cadastral fusion in 2023 requires verification of property boundaries

Impact: Potential uncertainty in exact property boundaries and rights

Mitigation: Obtain fusion documentation and updated cadastral surveys

🟡 KYC RiskAMBER

Corporate address changed from Amsterdam to Luxembourg between cadastral extracts

Impact: May indicate corporate restructuring or tax optimization requiring verification

Mitigation: Verify corporate structure and confirm current registered address

🟡 Legal RiskAMBER

Cadastral fusion requires boundary verification

Impact: Potential property boundary uncertainties

Mitigation: Obtain detailed fusion documentation and updated surveys

🟡 Legal RiskAMBER

Cadastral map shows provisional boundaries which may indicate ongoing boundary disputes or unresolved surveying issues

Impact: Could affect property boundaries and usable area calculations

Mitigation: Obtain detailed surveyor report and verify all boundary lines are established, not provisional

🟡 Technical RiskAMBER

Map disclaimer states reliable measurements cannot be derived from this document

Impact: Cannot rely on this document for precise area calculations or boundary measurements

Mitigation: Obtain professional surveyor measurements and detailed technical drawings

🟡 Legal RiskAMBER

Cadastral map shows provisional boundaries which may indicate ongoing boundary disputes or unresolved surveying issues

Impact: Could affect property boundaries and usable area calculations

Mitigation: Obtain detailed surveyor report and verify all boundary lines are established, not provisional

🟡 Technical RiskAMBER

Map disclaimer states reliable measurements cannot be derived from this document

Impact: Cannot rely on this document for precise area calculations or boundary measurements

Mitigation: Obtain professional surveyor measurements and detailed technical drawings

🟡 Legal RiskAMBER

Different reference notation suggests potential administrative inconsistency or separate transaction processing

Impact: May indicate this parcel is being handled differently or under separate transaction

Mitigation: Clarify reason for different reference format and ensure all parcels are included in single transaction

Document References

Recommendations

  1. Obtain detailed fusion documentation from 2023
  2. Verify current corporate address and status of M7 EREIP V Lux Dutch Holdco S.à r.l.
  3. Verify post-fusion property boundaries
  4. Confirm all BAG registrations are current and accurate
  5. Verify current corporate structure and registered address
  6. Obtain corporate registry extract from Luxembourg
  7. Obtain detailed surveyor report for precise measurements
  8. Verify all boundaries are established rather than provisional

4. 💰 Financial & Valuation

66/100Grade C
34 documents analyzedWeight: 30%

This category received a score of 66/100 based on the analysis of 34 documents. 5 high-risk findings were identified requiring immediate attention. 19 medium-risk items warrant further review.

Checklist Progress

18/18 items covered
Tax status & compliance
Transfer tax implications
WOZ valuation verification
Outstanding creditor claims
Current valuation / appraisal
Lease agreements review
Debt structure & existing financing
Lease agreements review (if applicable)
Title deed verification & ownership chain
Corporate structure / SPV documentation
...and 8 more items

Key Findings

FindingSeverityValue/Impact
WOZ 2023 assessment shows total property value of EUR 5,384,000 across four units🟢 greenEUR 5,384,000
Total 2023 municipal and water authority taxes due: EUR 13,895.57🟡 amberEUR 13,895.57
Property owned by M7 EREIP V Dutch PropCo 5 B.V. as of valuation date🟢 green
WOZ 2024 assessment shows increased total property value of EUR 5,564,000🟢 greenEUR 5,564,000
Property value increase of EUR 180,000 (3.3%) from 2023 to 2024🟢 greenEUR 180,000
Individual unit valuations: De Wel 18 (EUR 1,750,000), De Wel 20 (EUR 1,490,000), De Wel 20b (EUR 404,000), De Wel 22 (EUR 1,920,000)🟢 green
2025 user tax assessment issued to M7 EREIP V Lux Dutch Holdco S.a.r.l., indicating ownership structure change🟡 amberEUR 6,679.54
User tax (gebruiker belasting) rather than owner tax, suggesting tenant/user liability rather than ownership🟡 amber
Only three properties covered (De Wel 20, 20b, 22), excluding De Wel 18🟡 amber
Transfer of bank guarantee obligations from Intesa Sanpaolo Bank Luxembourg S.A. Amsterdam branch to Intesa Sanpaolo SpA Amsterdam branch🟡 amberBank Guarantee No BG 81545/795
Post-Brexit reorganization of banking group structure affecting guarantee arrangements🟡 amber
Request for cooperation under Dutch Civil Code article 6:159 for transfer of rights and obligations🟢 green
Annual rent indexation for Emoena Projects B.V. based on Dutch CPI🟢 greenEUR 3,376.86 (new annual rent)
Service costs indexation applied separately🟢 greenEUR 1,875.32 (new annual service costs)
CPI indexation rate of 2.84% applied🟢 green135.99/132.24 = 2.84% increase

Showing 15 of 96 findings.

Risk Flags

🟡 Financial RiskAMBER

Outstanding tax liability of EUR 13,895.57 with payment deadline April 30, 2023

Impact: Potential transfer of tax liability to new owner if not settled

Mitigation: Verify payment status and ensure settlement before completion

🟢 Financial RiskGREEN

Property values showing healthy appreciation trend

Impact: Positive market indicator but higher ongoing tax burden

Mitigation: Factor increased tax costs into financial projections

🟡 Legal RiskAMBER

Ownership structure appears to have changed between 2024 and 2025, with different entity responsible

Impact: Unclear ownership chain and potential title issues

Mitigation: Investigate ownership transfer and verify current legal title holder

🟡 Financial RiskAMBER

User tax rather than owner tax suggests different legal relationship to property

Impact: May indicate lease arrangement rather than ownership

Mitigation: Clarify legal status and relationship between entities

🔴 Legal RiskRED

De Wel 18 excluded from 2025 assessment, suggesting potential separate ownership

Impact: Portfolio may not be held by single entity, complicating acquisition

Mitigation: Urgent verification of ownership structure across all four properties

🟡 Financial RiskAMBER

Bank guarantee transferring between related but legally separate entities

Impact: Potential disruption to tenant security arrangements and guarantee validity

Mitigation: Verify current guarantee status, confirm transfer was properly executed, and validate guarantee remains enforceable

🟡 Legal RiskAMBER

Corporate restructuring may affect guarantee enforceability

Impact: Risk that guarantee protections for landlord may be compromised

Mitigation: Legal review of transfer documentation and confirmation of guarantee continuity

🟡 Financial RiskAMBER

Tenant concentration risk - single tenant occupying multiple units

Impact: High vacancy risk if tenant defaults or relocates

Mitigation: Review tenant creditworthiness and lease terms for break clauses

🟡 Financial RiskAMBER

Significant tenant concentration - largest tenant represents substantial portion of income

Impact: Major income loss if tenant vacates or defaults

Mitigation: Verify tenant creditworthiness, review lease terms and guarantees, assess tenant's business stability

🟢 Financial RiskGREEN

Standard CPI indexation applied correctly

Impact: Positive rental income increase of approximately 4.09%

Mitigation: No action required - standard lease indexation

Document References

Recommendations

  1. Verify payment status of 2023 tax assessment
  2. Confirm no penalties applied for late payment
  3. Review detailed tax assessment calculations
  4. Update financial projections with new WOZ values
  5. Urgent investigation of ownership structure between Dutch PropCo 5 B.V. and Lux Dutch Holdco
  6. Verify current legal title holders for all four properties
  7. Verify guarantee transfer was completed successfully
  8. Confirm current guarantee remains valid and enforceable

5. 🔍 KYC & AML

70/100Grade B
0 documents analyzedWeight: 20%

This category received a score of 70/100 based on the analysis of 0 documents. No significant issues were identified.

6. 🏗️ Technical & Environmental

80/100Grade A
330 documents analyzedWeight: 10%

This category received a score of 80/100 based on the analysis of 330 documents. 45 high-risk findings were identified requiring immediate attention. 74 medium-risk items warrant further review.

Checklist Progress

42/42 items covered
Building condition survey
Deferred maintenance backlog
Existing lease agreements & terms
MEP systems condition
Warranties & guarantees
Lease agreements review
Fire safety compliance
MEP systems condition (mechanical, electrical, plumbing)
MEP systems status
Building condition assessment
...and 32 more items

Key Findings

FindingSeverityValue/Impact
Handover inspection from 2019 showing various maintenance and completion issues🟡 amberMultiple outstanding items
Utility meter readings recorded at lease commencement🟢 greenGas: 4042768, Water: 60798454
Second floor not fully cleared and requires cleaning/restoration🔴 redFull floor remediation required
Property handover inspection conducted with identified defects🟡 amber4 defects identified
Broken washbasin in toilet requires replacement🟡 amberLandlord responsibility
Multiple building modifications required before handover🟡 amber6 modifications
Property handover inspection completed January 2, 2024 for vacant ground floor and first floor areas🟢 greenN/A
Discrepancy between lease start date (December 1, 2023) and actual handover date (January 1, 2024)🟡 amberN/A
Property delivered in vacant condition excluding existing tenant areas🟢 greenN/A
Property delivery inspection completed December 1, 2023 for February 1, 2024 lease commencement🟢 green
Multiple technical defects noted: toilet lighting defective and toilets very dirty🟡 amber
No access to gas and electricity meters for readings🟡 amber
Emergency lighting system inventory for De Wel 20 from 2016 with 15 emergency light fixtures🟡 amber15 fixtures
All fixtures require battery and light source replacement - equipment is 9 years old🔴 red
GE Healthcare office layout design for De Wel 18 with comprehensive space planning🟢 green484.78 m²

Showing 15 of 593 findings.

Risk Flags

🔴 Technical RiskRED

Significant outstanding maintenance and restoration work from 2019 may still be incomplete

Impact: Potential hidden maintenance costs and tenant disputes over property condition

Mitigation: Conduct current building condition survey to verify completion of all outstanding items

🟡 Financial RiskAMBER

Unclear responsibility allocation for various building systems and improvements

Impact: Potential disputes over maintenance and repair costs

Mitigation: Clarify current condition and responsibility matrix for all building systems

🟡 Technical RiskAMBER

Outdated inspection from 2019 - current building condition unknown

Impact: Acquisition based on potentially outdated technical information

Mitigation: Commission fresh technical due diligence survey

🟡 Technical RiskAMBER

Multiple defects and required modifications indicate potential maintenance issues

Impact: May indicate broader building condition problems or deferred maintenance

Mitigation: Ensure all agreed modifications were completed and verify current condition

🟢 Compliance RiskGREEN

Proper handover process documented with clear responsibility allocation

Impact: Low risk due to proper documentation

Mitigation: Maintain records for future reference

🟡 Contractual RiskAMBER

Date mismatch between lease commencement (Dec 1, 2023) and actual handover (Jan 1, 2024)

Impact: Potential rent payment issues or lease term confusion

Mitigation: Clarify actual rent commencement date and adjust lease documentation if necessary

🟢 Operational RiskGREEN

Clear ownership matrix established but requires ongoing compliance monitoring

Impact: Future disputes over maintenance and repair responsibilities

Mitigation: Ensure both parties understand and comply with ownership responsibilities

🟡 Technical RiskAMBER

Property delivered with known defects and maintenance issues

Impact: Potential tenant disputes or additional maintenance costs to address defective toilet lighting and cleanliness issues

Mitigation: Ensure defects are remediated before lease commencement or document tenant acceptance

🟡 Compliance RiskAMBER

Meter readings not accessible during handover inspection

Impact: Potential billing disputes and inability to properly track utility consumption from lease start

Mitigation: Ensure meter access is provided and baseline readings obtained before lease commencement

🟡 Technical RiskAMBER

Tenant renovations require HVAC and fire safety system modifications

Impact: Potential compliance issues or additional costs if systems are not properly upgraded by tenant

Mitigation: Ensure tenant renovation plans include proper technical permits and approvals for system modifications

Document References

Recommendations

  1. Commission current building condition survey immediately
  2. Verify completion status of all items listed in 2019 handover report
  3. Verify all agreed modifications were completed satisfactorily
  4. Conduct current condition survey to assess any deterioration since 2021
  5. Resolve discrepancy between lease commencement date and handover date
  6. Confirm actual rent payment start date
  7. Resolve toilet lighting defect before lease commencement
  8. Ensure toilet cleaning is completed

7. 📋 Contractual & Lease

71/100Grade B
33 documents analyzedWeight: 10%

This category received a score of 71/100 based on the analysis of 33 documents. 4 high-risk findings were identified requiring immediate attention. 16 medium-risk items warrant further review.

Checklist Progress

20/20 items covered
Existing lease agreements & terms
Vacancy rate & lease expiry profile
Tenant quality & creditworthiness
Revenue / rental income analysis
Power of attorney / signing authority
VAT position
Lease agreements review (if applicable)
Lease agreements review
Corporate structure / SPV documentation
UBO identification & verification
...and 10 more items

Key Findings

FindingSeverityValue/Impact
Lease termination confirmation for GE Healthcare unit 1.03 on 1st floor🔴 red454 m² floor area
Tenant exercised early termination option per lease article 3.4🟡 amber
Property handover requirements - vacant, clean, complete and operational condition🟢 green
Original tenant notice to terminate unit 1.03 lease with incorrect termination date🟡 amberUnit 1.03
Bram Nijp acting as authorized representative for GE Healthcare lease termination🟢 green
Tenant referenced early termination option for one unit in existing lease agreement🟡 amber
New 5 year 5 month lease agreement with GE Healthcare B.V. starting January 1, 2025🟢 green€160,050 annual rent plus VAT
1,500 sqm office space with 33 parking spaces at De Wel 18, Hoevelaken🟢 green1,500 sqm
Bank guarantee required of €67,763.03 (3 months payment obligation)🟢 green€67,763.03
5-year lease agreement with automatic renewal clauses🟢 green5 years initial term
Annual rent of €69,265 plus VAT with CPI indexation🟢 green€69,265 per year
Bank guarantee required of €27,369🟡 amber€27,369
New 2-year lease agreement for 1,022 m² office space starting December 1, 2023🟢 greenEUR 3,171 per year base rent
Tenant operates under trade name 'Crown Slim Werken' for subletting office spaces🟡 amberN/A
Very low annual rent of EUR 3.10/m² suggests favorable tenant terms or potential undervaluation🟡 amberEUR 3,171 annual rent for 1,022 m²

Showing 15 of 79 findings.

Risk Flags

🔴 Commercial RiskRED

Loss of significant tenant (GE Healthcare) reducing rental income

Impact: Immediate vacancy of 454 m² resulting in lost rental income and re-letting costs

Mitigation: Begin marketing unit immediately, assess market conditions for re-letting, budget for void periods and leasing costs

🔴 Financial RiskRED

Revenue impact from tenant departure

Impact: Loss of rental income from May 2026, potential costs for property condition rectification

Mitigation: Calculate exact rental loss, assess re-letting prospects, factor into acquisition pricing

🟡 Legal RiskAMBER

Discrepancy between tenant's stated termination date (November 1, 2025) and actual lease terms

Impact: Potential confusion over effective termination date and notice periods

Mitigation: Verify correct termination date per lease terms, ensure proper notice period compliance

🟢 Contractual RiskGREEN

Tenant exercising contractual right to partial early termination

Impact: Legitimate exercise of lease terms reduces legal risk but confirms vacancy

Mitigation: Review lease agreement to understand remaining tenant obligations and rights

🟡 Financial RiskAMBER

Tenant has unilateral right to terminate 30% of leased space (454 sqm) with only 6 months notice

Impact: Potential significant rental income reduction with short notice period

Mitigation: Negotiate longer notice period or removal of partial termination right in future lease negotiations

🟢 Legal RiskGREEN

Complex ownership structure with Luxembourg entity as landlord

Impact: Potential complications in enforcement or legal proceedings

Mitigation: Verify proper authorization and corporate structure documentation

🟡 Financial RiskAMBER

Bank guarantee requirement indicates potential credit risk concerns

Impact: Security deposit may be difficult to recover if tenant defaults

Mitigation: Verify bank guarantee is in place and validate tenant creditworthiness

🟡 Legal RiskAMBER

Use restriction limits tenant flexibility and potential tenant pool

Impact: May affect re-letting potential and rental value

Mitigation: Consider market demand for showroom space in this location

🟡 Financial RiskAMBER

Extremely low rent of EUR 3.10/m² per year appears significantly below market rates

Impact: Potential undervaluation or special arrangement affecting property income

Mitigation: Conduct market rent analysis and verify if this is a temporary arrangement or long-term commitment

🟡 Credit RiskAMBER

No security deposit or bank guarantee provided by tenant

Impact: Limited recourse in case of tenant default or damages

Mitigation: Conduct enhanced credit check on Emoena Projects B.V. and consider requiring security

Document References

Recommendations

  1. Factor rental loss into acquisition pricing
  2. Assess re-letting market conditions immediately
  3. Reconcile termination date discrepancy between tenant notice and lease terms
  4. Verify authority of Bram Nijp to terminate on behalf of GE Healthcare
  5. Verify GE Healthcare B.V. financial standing and credit rating
  6. Review energy label attachment mentioned in contract
  7. Verify bank guarantee is properly executed and in place
  8. Assess market demand for showroom space in Hoevelaken

8. 🏛️ Permits & Compliance

66/100Grade C
14 documents analyzedWeight: 8%

This category received a score of 66/100 based on the analysis of 14 documents. 1 high-risk findings were identified requiring immediate attention. 10 medium-risk items warrant further review.

Checklist Progress

13/13 items covered
Building permits status
Zoning / land use designation
Planning permissions for intended use
Compliance with local regulations
Environmental permits
Fire safety compliance
Structural integrity assessment
Building condition survey
Building permits
Usage permits
...and 3 more items

Key Findings

FindingSeverityValue/Impact
Building permit granted for 3 office buildings with height exemption from 9m to 12m🟡 amberEUR 6,806,819.28
Correction issued changing description from 'office buildings' to 'business buildings with office' to comply with zoning🟡 amber
Height exemption granted under zoning plan Bedrijventerrein Horstbeek 1997🟢 green
Additional building permit granted for 3 bicycle/container storage buildings🟢 greenEUR 21,000.00
Ancillary structures comply with zoning plan Bedrijventerrein Horstbeek 1997🟢 green
Original building permit application for 3 office buildings with extensive technical documentation🟢 greenEUR 6,806,819.28
Fire safety assessment completed with specific requirements for transparent lighting on third floor🟢 green
Soil investigation report and structural calculations included in application🟢 green
Original architectural drawings for 3 office buildings (A, B, C) from 2001🟢 green
Detailed construction specifications including steel structure, insulation (Rc=3.0m2K/W), and facade materials🟢 green
Buildings designed for office use with business spaces (kantoren met bedrijfsruimten)🟢 green
Building permit application for bicycle/container storage facility at De Wel 18-24🟢 greenEUR 21,000.00
Application for 3 bicycle/container storage units as ancillary structures🟢 green
Building areas: 0 m² before construction, 99.0 m² after construction🟢 green99.0 m²
Duplicate architectural drawings for 3 office buildings (A, B, C) from 2001🟢 green

Showing 15 of 34 findings.

Risk Flags

🟡 Planning RiskAMBER

Initial permit incorrectly described buildings as 'office buildings' requiring correction to 'business buildings with office'

Impact: Could indicate zoning compliance issues or restrictions on pure office use

Mitigation: Verify current zoning compliance and permitted uses under existing zoning plan

🟡 Environmental RiskAMBER

Soil contamination investigation waived based on existing municipal data, with warning of owner liability

Impact: Potential undiscovered soil contamination with full liability on property owner

Mitigation: Conduct independent soil contamination assessment before acquisition

🟡 Technical RiskAMBER

Drawings are from 2001 - need verification that as-built conditions match original plans

Impact: Potential discrepancies between designed and actual building conditions

Mitigation: Conduct as-built survey and compare with original drawings

🟡 Compliance RiskAMBER

Building codes and regulations may have changed since 2001

Impact: Current building may not meet modern standards without updates

Mitigation: Verify compliance with current Dutch building codes and energy standards

🟡 Compliance RiskAMBER

Need to verify if building permit was actually granted and construction completed as approved

Impact: Potential unauthorized construction or non-compliance issues

Mitigation: Obtain copy of granted building permit and completion certificate

🟡 Document Management RiskAMBER

Duplicate drawings may indicate version control issues or incomplete document management

Impact: Potential confusion about which drawings are current/approved

Mitigation: Clarify which drawing set is the official approved version

🟡 Compliance RiskAMBER

Height exemption granted exceeding standard zoning limits by 33% (12m vs 9m)

Impact: Could affect future development rights or planning permissions

Mitigation: Verify exemption is permanently recorded and transferable to new owner

🟡 Legal RiskAMBER

Multiple exemptions required for building permit approval

Impact: May indicate property does not fully conform to standard zoning requirements

Mitigation: Confirm all exemptions are legally binding and documented in property title

🟢 Administrative RiskGREEN

Standard permit process with no exemptions required

Impact: Minimal impact - auxiliary structures properly permitted

Mitigation: Verify storage facilities are included in property transfer

🔴 Permit RequiredRED

Environmental building permit required for fire safety compliance - not yet submitted to municipality

Impact: Cannot proceed with current use without proper permits, potential fines

Mitigation: Immediate submission of omgevingsvergunning bouwen required

Document References

Recommendations

  1. Verify current zoning compliance and permitted uses
  2. Conduct independent soil contamination assessment
  3. Verify bicycle/container storage structures are built and maintained per permit
  4. Verify all technical requirements from original application have been implemented
  5. Confirm fire safety systems match approved specifications
  6. Commission as-built survey to verify current conditions match drawings
  7. Verify current building code compliance
  8. Obtain copy of granted building permit

9. 📊 Commercial & Market

70/100Grade B
0 documents analyzedWeight: 5%

This category received a score of 70/100 based on the analysis of 0 documents. No significant issues were identified.

10. Risk Matrix

Category🟢 Green (Low)🟡 Amber (Medium)🔴 Red (High)TotalScore
⚖️ Legal & Title4701175
💰 Financial & Valuation101953466
🔍 KYC & AML000085
🏗️ Technical & Environmental211744533080
📋 Contractual & Lease131643371
🏛️ Permits & Compliance31011466
📊 Commercial & Market000085
Total3291265551071

11. Document Register

Complete register of all 510 documents, sorted by risk level.

#FilenameTypeCategoryRiskConfidenceManual Review
1woz-2025-aanslag-de-wel-18-22-hoevelaken-gebruiker.pdfotherFinancial & Valuation🔴 redhigh⚠️ Yes
2corr-2025-bev-huuropzegging-ge-healthcare-de-wel-18.pdfotherContractual & Lease🔴 redhigh⚠️ Yes
3all1-house-of-investing-de-wel-18-22.pdfotherContractual & Lease🔴 redhigh⚠️ Yes
4lijst-1.PDFotherTechnical & Environmental🔴 redhigh⚠️ Yes
5tek-2025-clarke-brandcomp-advies-nr-18 (1).pdfotherPermits & Compliance🔴 redhigh⚠️ Yes
6fct-2023-afrek-sk-de-wel-18-22-hoevelaken-3.pdfotherFinancial & Valuation🔴 redhigh⚠️ Yes
7lijst-2023-afrek-sk-de-wel-22-hoevelaken.pdfotherFinancial & Valuation🔴 redhigh⚠️ Yes
8lijst-2023-afrek-sk-de-wel-20-hoevelaken.xlsxotherContractual & Lease🔴 redhigh⚠️ Yes
9lijst-2023-afrek-sk-de-wel-22-hoevelaken.xlsxotherContractual & Lease🔴 redhigh⚠️ Yes
10legio-2024-keerklepcontrole-de-wel-18.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
11legio-2024-keerklepcontrole-de-wel-20.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
12legio-2024-keerklepcontrole-de-wel-22-24.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
13legio-2024-wateronderzoek-tl77034-de-wel-20.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
14legio-2024-wateronderzoek-tl77036-de-wel-22-24.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
15legio-2024-wateronderzoek-tl80475-de-wel-20.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
16legio-2025-wateronderzoek-tl83633-de-wel-20.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
17ohc-leertouwer-onderhoud-bmi-insp-geb-b-2021-03-15.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
18cert-2019-scioa-bvn-aaa-24-de-wel-18.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
19cert-2019-scios-bvn-aaa-19-de-wel-22-24 (1).pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
20cert-2019-scios-bvn-aaa-19-de-wel-22-24.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
21cert-2019-scios-bvn-aaa-24-de-wel-18.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
22cert-2020-liftinstallatie-100300320-de-wel-20.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
23cert-2020-liftinstallatie-387101601-de-wel-18.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
24cert-2020-liftinstallatie-387102001-de-wel-22-24.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
25cert-2020-scios-abd656-de-wel-20.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
26cert-2022-liftinstallatie-100300320-de-wel-20.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
27cert-2022-liftinstallatie-387101601-de-wel-18.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
28cert-2025-liftinstallatie-387102001-de-wel-22-24.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
29lijst-overig-de-wel-looplijst-noodverlichting.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
30rap-2015-all-install-onderhoud-lbk-de-wel-18.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
31rap-2015-all-install-onderhoud-stookinstallatie-de-wel-18.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
32rap-2015-onderhoud-bmi-oai.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
33rap-2016-veritas-nen3140-inspectie-de-wel-18-24.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
34rap-2017-all-install-onderhoud-stookinstallatie-de-wel-18.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
35rap-2017-blusmiddelen-de-wel-18.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
36rap-2017-vitens-gebreken-drinkwaterinstallatie-de-wel-20.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
37rap-2017-vitens-gebreken-drinkwaterinstallatie-de-wel-22-24.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
38rap-2018-leertouwer-onderhoud-de-wel-20.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
39rap-2020-ign-leegstand-1-nen3140-de-wel-18-24.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
40rap-2020-leertouwer-onderhoud-bmi-de-wel-18.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
41rap-2020-liftinstallatie-100300320-de-wel-20-2.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
42rap-2020-liftinstallatie-100300320-de-wel-20.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
43rap-2021-energielive-monitoringsdienst-elektra-de-wel-20.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
44rap-2021-leertouwer-onderhoud-bmi-de-wel-20.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
45rap-2023-leertouwer-onderhoud-bmi-de-wel-18.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
46rap-2024-arepa-nen3140-de-wel-18.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
47rap-2025-energysafe-q1-de-wel-22-24.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
48rap-2025-leertouwer-oh-bmi-de-wel-18.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
49rap-2025-leertouwer-oh-bmi-de-wel-20.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
50rap-2025-leertouwer-oh-bmi-de-wel-22-24.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
51rap-2025-venrooy-dakinspectie-de-wel-18.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
52rap-2025-venrooy-dakinspectie-de-wel-20.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
53rap-2025-venrooy-dakinspectie-de-wel-22-24.pdfotherTechnical & Environmental🔴 redhigh⚠️ Yes
54lijst-2024-afrek-sk-de-wel-20-hoevelaken.xlsxotherFinancial & Valuation🔴 redhigh⚠️ Yes
55lijst-2024-afrek-sk-de-wel-22-hoevelaken.xlsxotherFinancial & Valuation🔴 redhigh⚠️ Yes
56woz-2023-aanslag-de-wel-18-22-hoevelaken.pdfotherFinancial & Valuation🟡 amberhigh✅ No
57kad-2025-eigendomsinformatie-c-5586-de-wel-18-22.pdfotherLegal & Title🟡 amberhigh✅ No
58kad-2025-eigendomsinformatie-c-5587-de-wel-18-22.pdfotherLegal & Title🟡 amberhigh✅ No
59kad-2025-eigendomsinformatie-c-5588-de-wel-18-22.pdfotherLegal & Title🟡 amberhigh✅ No
60kad-2025-kaart-c-5586-de-wel-18-22.pdfotherLegal & Title🟡 ambermedium✅ No
61kad-2025-kaart-c-5587-de-wel-18-22.pdfotherLegal & Title🟡 ambermedium✅ No
62kad-2025-kaart-c-5588-de-wel-18-22.pdfotherLegal & Title🟡 ambermedium✅ No
63akte-2019-akte-van-levering-de-wel-18-22-hoevelaken.pdfotherLegal & Title🟡 ambermedium✅ No
64corr-2001-bouwvergunning-de-wel-18-22-hoevelaken.pdfotherPermits & Compliance🟡 amberhigh✅ No
65verg-2001-bouwtekeningen-3-kantoorpanden-hoevelaken.pdfotherPermits & Compliance🟡 amberhigh✅ No
66verg-2009-aangvraag-bouwverg-de-wel-18-22-hoevelaken.pdfotherPermits & Compliance🟡 ambermedium✅ No
67verg-bouwtekening-de-wel-18-22-hoevelaken-2.pdfotherPermits & Compliance🟡 amberhigh✅ No
68verg-loopbrief-de-wel-18-22-hoevelaken-2.pdfotherPermits & Compliance🟡 amberhigh✅ No
69bg-2021-transfer-of-rights-obligations-de-wel-18-22.pdfotherFinancial & Valuation🟡 amberhigh✅ No
70corr-2025-huuropzegging-ge-healthcare-de-wel-18.pdfotherContractual & Lease🟡 ambermedium✅ No
71pvo-2019-start-huur-ge-healthcare-de-wel-18.pdfotherTechnical & Environmental🟡 ambermedium⚠️ Yes
72ho-bubbelkoning-de-wel-20-hoevelaken.pdfotherContractual & Lease🟡 amberhigh✅ No
73pvo-start-huur-bubbelkoning-de-wel-20-hoevelaken.pdfotherTechnical & Environmental🟡 amberhigh✅ No
74ho-emoena-projects-de-wel-20-hoevaken.pdfotherContractual & Lease🟡 amberhigh✅ No
75pvo-start-huur-emoena-projects-de-wel-20-hoevelaken.pdfotherTechnical & Environmental🟡 amberhigh✅ No
76corr-2025-bev-huuropzegging-house-of-investing.pdfotherContractual & Lease🟡 amberhigh✅ No
77corr-2025-huuropzegging-house-of-investing.pdfotherContractual & Lease🟡 amberhigh✅ No
78ho-house-of-investing-de-wel-18-22.pdfotherContractual & Lease🟡 amberhigh✅ No
79all1-remate-de-wel-18-22-hoevelaken.pdfotherContractual & Lease🟡 amberhigh✅ No
80ho-d-oort-hodn-eenmanszaak-remate-de-wel-20.pdfotherContractual & Lease🟡 amberhigh✅ No
81ho-orbusneich-hoevelaken.pdfotherContractual & Lease🟡 amberhigh✅ No
82pvo-start-huur-orbusneich-hoevelaken.pdfotherTechnical & Environmental🟡 amberhigh✅ No
83rf-orbusneich-de-wel-18-22-hoevelaken.pdfotherContractual & Lease🟡 amberhigh✅ No
84index-2025-emoena-projects.pdfotherFinancial & Valuation🟡 amberhigh✅ No
85index-2025-orbusneich.pdfotherFinancial & Valuation🟡 amberhigh✅ No
86index-2025-yourizon.pdfotherFinancial & Valuation🟡 amberhigh✅ No
87index-2026-bubbelkoning.pdfotherFinancial & Valuation🟡 ambermedium✅ No
88index-2026-ge-healthcare.pdfotherContractual & Lease🟡 ambermedium✅ No
89fct-dec-2025-emoena-projects.pdfotherFinancial & Valuation🟡 amberhigh✅ No
90fct-dec-2025-house-of-investing.pdfotherFinancial & Valuation🟡 ambermedium✅ No
91fct-dec-2025-remate.pdfotherFinancial & Valuation🟡 amberhigh✅ No
92fct-jan-2026-emoena-projects.pdfotherFinancial & Valuation🟡 amberhigh✅ No
93fct-jan-2026-remate.pdfotherFinancial & Valuation🟡 amberhigh✅ No
94fct-q1-2026-orbusneich.pdfotherFinancial & Valuation🟡 amberhigh✅ No
95fct-q1-2026-yourizon.pdfotherFinancial & Valuation🟡 amberhigh✅ No
96fct-q4-2025-bubbelkoning.pdfotherFinancial & Valuation🟡 amberhigh✅ No
97tek-2025-clarke-brandcomp-advies-nr-18.pdfotherTechnical & Environmental🟡 amberhigh✅ No
98tek-2025-clarke-brandcomp-advies-nr-20.pdfotherTechnical & Environmental🟡 amberhigh✅ No
99tek-2025-clarke-brandcomp-vergund-2001-nr-18.pdfotherTechnical & Environmental🟡 amberhigh✅ No
100tek-2025-clarke-brandcomp-vergund-2001-nr-20.pdfotherPermits & Compliance🟡 amberhigh✅ No
101tek-2025-clarke-brandcomp-vergund-2001-nr-22-24.pdfotherPermits & Compliance🟡 amberhigh✅ No
102epc-energielabel-de-wel-18-te-hoevelaken.pdfotherTechnical & Environmental🟡 amberhigh✅ No
103epc-energielabel-de-wel-20-te-hoevelaken.pdfotherTechnical & Environmental🟡 amberhigh✅ No
104epc-energielabel-de-wel-22-te-hoevelaken.pdfotherTechnical & Environmental🟡 amberhigh✅ No
105nen2580-2024-meetrapport-de-wel-18-hoevelaken.pdfotherTechnical & Environmental🟡 amberhigh✅ No
106fct-2023-afrek-sk-de-wel-18-22-hoevelaken-2.pdfotherFinancial & Valuation🟡 amberhigh✅ No
107fct-2023-afrek-sk-de-wel-18-22-hoevelaken.pdfotherFinancial & Valuation🟡 amberhigh✅ No
108lijst-2023-afrek-sk-de-wel-20-hoevelaken.pdfotherFinancial & Valuation🟡 amberhigh✅ No
109lijst-2023-afrek-sk-de-wel-18-hoevelaken.xlsxotherFinancial & Valuation🟡 amberhigh✅ No
110lijst-afrek-sk-2023-de-wel-18-hoevelaken.xlsxotherContractual & Lease🟡 amberhigh✅ No
111bodem-2017-historisch-bodemonderzoek-de-wel-18-24.pdfotherTechnical & Environmental🟡 amberhigh✅ No
112legio-2024-herkeuring-keerkleppen-de-wel-20.pdfotherTechnical & Environmental🟡 amberhigh✅ No
113legio-2025-wateronderzoek-tl83187-de-wel-20.pdfotherTechnical & Environmental🟡 amberhigh✅ No
114milieu-2019-ambiente-environm-sum-de-wel-18-24.pdfotherTechnical & Environmental🟡 ambermedium✅ No
115brf-2023-hoogendoorn-indexatie-2024.pdfotherContractual & Lease🟡 amberhigh✅ No
116eo-2024-50five-exploitatieovereenkomst-laadpalen-2024-07-19.pdfotherContractual & Lease🟡 amberhigh✅ No
117ohc-easy-office-online-abonnement-glasvezel-2021-08-10.pdfotherTechnical & Environmental🟡 ambermedium✅ No
118ohc-homij-oh-w-installaties-2023-12-22-2.pdfotherContractual & Lease🟡 amberhigh✅ No
119ohc-homij-oh-w-installaties-2023-12-22-3.pdfotherContractual & Lease🟡 amberhigh✅ No
120ohc-homij-oh-w-installaties-2023-12-22.pdfotherTechnical & Environmental🟡 amberhigh✅ No
121ohc-leertouwer-gewijzigd-contract-2024-12-02.pdfotherTechnical & Environmental🟡 amberhigh✅ No
122ohc-leertouwer-onderhoud-bmi-insp-2021-03-15.pdfotherTechnical & Environmental🟡 ambermedium✅ No
123ohc-leertouwer-uitbreiding-wijziging-2024-11-11.pdfotherTechnical & Environmental🟡 amberhigh✅ No
124ohc-liander-elektra-2019-04-08.pdfotherTechnical & Environmental🟡 amberhigh✅ No
125ohc-trigion-abonn-meldkamer-bmi-alarm-2020-11-07.pdfotherTechnical & Environmental🟡 amberhigh✅ No
126ohc-van-venrooy-dakinspectie-20-2025-01-17.pdfotherTechnical & Environmental🟡 amberhigh✅ No
127ohc-van-venrooy-dakinspectie-nr-18-2025-01-17.pdfotherTechnical & Environmental🟡 amberhigh✅ No
128ohc-van-venrooy-dakinspectie-nr-22-24-2025-01-17.pdfotherTechnical & Environmental🟡 amberhigh✅ No
129cert-2019-scios-abd655-rap-de-wel-18.pdfotherTechnical & Environmental🟡 amberhigh✅ No
130cert-2019-scios-abd657-rap-de-wel-22-24.pdfotherTechnical & Environmental🟡 amberhigh✅ No
131cert-2019-scios-bxu-aaa-40-de-wel-20.pdfotherTechnical & Environmental🟡 amberhigh✅ No
132cert-2024-liftinstallatie-387101601-de-wel.pdfotherTechnical & Environmental🟡 amberhigh✅ No
133cert-2025-liftinstallatie-100300320-de-wel-20.pdfotherTechnical & Environmental🟡 amberhigh✅ No
134fct-2020-ftc-brandveiligheid-de-wel-18-22 (1).pdfotherTechnical & Environmental🟡 amberhigh✅ No
135pva-2025-clarke-brandveiligheid-de-wel-18.pdfotherTechnical & Environmental🟡 amberhigh✅ No
136pva-2025-clarke-brandveiligheid-de-wel-20.pdfotherTechnical & Environmental🟡 amberhigh✅ No
137pva-2025-clarke-brandveiligheid-de-wel-22-24.pdfotherTechnical & Environmental🟡 amberhigh✅ No
138rap-2015-all-install-onderhoud-stookinstallatie-de-wel-20.pdfotherTechnical & Environmental🟡 amberhigh✅ No
139rap-2015-all-install-onderhoud-stookinstallatie-de-wel-22-24.pdfotherTechnical & Environmental🟡 amberhigh✅ No
140rap-2015-inspectie-onderhoudslijst-lbk-de-wel-2.pdfotherTechnical & Environmental🟡 amberhigh✅ No
141rap-2016-smeba-onderhoud-brandblussers-de-wel-20.pdfotherPermits & Compliance🟡 amberhigh✅ No
142rap-2016-smeda-onderhoud-blusmiddelen-de-wel-20.pdfotherPermits & Compliance🟡 amberhigh✅ No
143rap-2017-all-install-onderhoud-lbk-de-wel-18.pdfotherTechnical & Environmental🟡 amberhigh✅ No
144rap-2017-all-install-onderhoud-lbk-de-wel-22-24.pdfotherTechnical & Environmental🟡 amberhigh✅ No
145rap-2017-all-install-onderhoud-stookinstallatie-de-wel-20.pdfotherTechnical & Environmental🟡 amberhigh✅ No
146rap-2017-all-install-onderhoud-stookinstallatie-de-wel-22-24.pdfotherTechnical & Environmental🟡 amberhigh✅ No
147rap-2017-onderhoud-brandblussers-de-wel-18-2.pdfotherTechnical & Environmental🟡 amberhigh✅ No
148rap-2017-onderhoud-brandblussers-de-wel-18-24.pdfotherTechnical & Environmental🟡 amberhigh✅ No
149rap-2017-onderhoud-brandblussers-de-wel-22-24.pdfotherTechnical & Environmental🟡 amberhigh✅ No
150rap-2018-blusmiddelen-de-wel-22-24.pdfotherTechnical & Environmental🟡 amberhigh⚠️ Yes
151rap-2018-leertouwer-nen3140-de-wel-18.pdfotherTechnical & Environmental🟡 ambermedium✅ No
152rap-2018-leertouwer-veiligheidinspectie-de-wel-18.pdfotherTechnical & Environmental🟡 amberhigh✅ No
153rap-2020-ign-leegstand-2-nen3140-de-wel-18-24.pdfotherTechnical & Environmental🟡 amberhigh✅ No
154rap-2020-koelplan-onderhoud-lbk-de-wel-18-24.pdfotherTechnical & Environmental🟡 amberhigh⚠️ Yes
155rap-2020-leertouwer-onderhoud-bmi-de-wel-20.pdfotherTechnical & Environmental🟡 amberhigh✅ No
156rap-2020-leertouwer-veiligheidsinspectie-de-wel-22-24.pdfotherTechnical & Environmental🟡 ambermedium✅ No
157rap-2020-liftinstallatie-387101601-de-wel-18.pdfotherTechnical & Environmental🟡 amberhigh✅ No
158rap-2020-liftinstallatie-387102001-de-wel-22-24-2.pdfotherTechnical & Environmental🟡 amberhigh✅ No
159rap-2020-liftinstallatie-387102001-de-wel-22-24.pdfotherTechnical & Environmental🟡 amberhigh✅ No
160rap-2020-oh-bmi-de-wel-20.pdfotherTechnical & Environmental🟡 amberhigh✅ No
161rap-2021-leertouwer-onderhoud-bmi-de-wel-18.pdfotherTechnical & Environmental🟡 amberhigh✅ No
162rap-2021-leertouwer-veiligheidsinspectie-de-wel-20.pdfotherTechnical & Environmental🟡 ambermedium✅ No
163rap-2021-leertouwer-veiligheidsinspectie-de-wel-22-24.pdfotherTechnical & Environmental🟡 ambermedium✅ No
164rap-2022-leertouwer-veiligheidsinspectie-de-wel-18.pdfotherTechnical & Environmental🟡 amberlow✅ No
165rap-2022-liftinstallatie-100300320-de-wel-20.pdfotherTechnical & Environmental🟡 amberhigh✅ No
166rap-2022-liftinstallatie-387101601-2022-03-18.pdfotherTechnical & Environmental🟡 amberhigh✅ No
167rap-2022-liftinstallatie-387101601-de-wel-18.pdfotherTechnical & Environmental🟡 amberhigh✅ No
168rap-2022-rrs-rioolinspectie-de-wel-20.pdfotherTechnical & Environmental🟡 amberhigh✅ No
169rap-2023-arepa-nen3140-de-wel-20.pdfotherTechnical & Environmental🟡 amberhigh✅ No
170rap-2023-leertouwer-nen-3140-de-wel-20.pdfotherTechnical & Environmental🟡 amberhigh✅ No
171rap-2023-toetsingskader-eml-de-wel-18.pdfotherTechnical & Environmental🟡 amberlow✅ No
172rap-2023-vitens-beperkte-risico-de-wel-20.pdfotherTechnical & Environmental🟡 amberhigh✅ No
173rap-2024-arepa-nen3140-de-wel-20.pdfotherTechnical & Environmental🟡 amberhigh✅ No
174rap-2024-arepa-nen3140-de-wel-22-24.pdfotherTechnical & Environmental🟡 amberhigh✅ No
175rap-2025-energysafe-q1-de-wel-18.pdfotherTechnical & Environmental🟡 amberhigh✅ No
176rap-2025-eurosafe-rie-rapportage-de-wel-22-24.pdfotherTechnical & Environmental🟡 amberhigh✅ No
177rap-2025-liftinstallatie-100300320-de-wel-20.pdfotherTechnical & Environmental🟡 amberhigh✅ No
178rap-2025-omgevingsloket-de-wel-18.pdfotherPermits & Compliance🟡 amberhigh✅ No
179tek-202-eurosafe-rie-rapportage-de-wel-20.pdfotherTechnical & Environmental🟡 amberhigh⚠️ Yes
180tek-2025-eurosafe-rie-rapportage-de-wel-18.pdfotherTechnical & Environmental🟡 amberhigh⚠️ Yes
181lijst-2024-afrek-sk-de-wel-18-hoevelaken.xlsxotherFinancial & Valuation🟡 amberhigh✅ No
182woz-2024-aanslag-de-wel-18-22-hoevelaken.pdfotherFinancial & Valuation🟢 greenhigh✅ No
183corr-2003-bouwverg-regul-de-wel-18-24-hoevelaken.pdfotherPermits & Compliance🟢 greenhigh✅ No
184verg-2000-aanvraag-bouwverg-de-wel-18-22-hoevelaken.pdfotherPermits & Compliance🟢 greenhigh✅ No
185verg-loopbrief-de-wel-18-22-hoevelaken.pdfotherPermits & Compliance🟢 greenhigh✅ No
186ho-2025-ge-healthcare-de-wel-18.pdfotherContractual & Lease🟢 greenhigh✅ No
187ho-yourizon-de-wel-20-hoevelaken.pdfotherContractual & Lease🟢 greenhigh✅ No
188pvo-start-huur-yourizon-de-wel-20-hoevelaken.pdfotherContractual & Lease🟢 greenhigh✅ No
189ho-signlog-orbusneich-hoevelaken.pdfotherLegal & Title🟢 greenhigh✅ No
190index-2025-house-of-investing.pdfotherFinancial & Valuation🟢 greenhigh✅ No
191index-2025-remate.pdfotherFinancial & Valuation🟢 greenhigh✅ No
192fct-jan-2026-house-of-investing.pdfotherFinancial & Valuation🟢 greenhigh✅ No
193fct-q1-2026-bubbelkoning.pdfotherFinancial & Valuation🟢 greenhigh✅ No
194fct-q1-2026-ge-healthcare.pdfotherFinancial & Valuation🟢 greenhigh✅ No
195fct-q4-2025-ge-healthcare.pdfotherFinancial & Valuation🟢 greenhigh✅ No
196fct-q4-2025-orbusneich.pdfotherFinancial & Valuation🟢 greenhigh✅ No
197fct-q4-2025-yourizon.pdfotherFinancial & Valuation🟢 greenhigh✅ No
198overzicht-garanties-de-wel-18-22-hoevelaken.pdfotherContractual & Lease🟢 greenhigh✅ No
199tek-2019-de-wel-nieuwe-indeling-ge-health.pdfotherTechnical & Environmental🟢 greenhigh✅ No
200tek-2025-de-wel-tekening-cv-installatie.pdfotherTechnical & Environmental🟢 greenhigh✅ No
201nen2580-2018-meetrapport-de-wel-20-hoevelaken.pdfotherTechnical & Environmental🟢 greenhigh✅ No
202nen2580-2018-meetrapport-de-wel-22-24-hoevelaken.pdfotherTechnical & Environmental🟢 greenhigh✅ No
203nen2580-2024-plattegronden-de-wel-18-hoevelaken.pdfotherTechnical & Environmental🟢 greenhigh✅ No
204lijst-2023-afrek-sk-de-wel-18-hoevelaken.pdfotherFinancial & Valuation🟢 greenhigh✅ No
205legio-2024-afger-techn-aanp-tl77406-1-de-wel-20.pdfotherTechnical & Environmental🟢 greenhigh✅ No
206legio-2024-afger-techn-aanp-tl77406-de-wel-20.pdfotherTechnical & Environmental🟢 greenhigh✅ No
207legio-2024-afger-techn-aanp-tl77407-de-wel-22-24.pdfotherTechnical & Environmental🟢 greenhigh✅ No
208legio-2024-herkeuring-keerkleppen-de-wel-22-24.pdfotherTechnical & Environmental🟢 greenhigh✅ No
209legio-2024-wateronderzoek-tl77644-de-wel-22-24.pdfotherTechnical & Environmental🟢 greenhigh✅ No
210legio-2025-afger-tech-aanpas-de-wel-18.pdfotherTechnical & Environmental🟢 greenhigh✅ No
211legio-2025-herk-keerklepcontrole-de-wel-18.pdfotherTechnical & Environmental🟢 greenhigh✅ No
212legio-2025-wateronderzoek-tl83185-de-wel-18.pdfotherTechnical & Environmental🟢 greenhigh✅ No
213legio-2025-wateronderzoek-tl83186-de-wel-22-24.pdfotherTechnical & Environmental🟢 greenhigh✅ No
214legio-2025-wateronderzoek-tl86539-de-wel-18.pdfotherTechnical & Environmental🟢 greenhigh✅ No
215legio-2025-wateronderzoek-tl86540-de-wel-22-24.pdfotherTechnical & Environmental🟢 greenhigh✅ No
216ohc-energysafe-propertyview-22-5-2024-2024-05-24.pdfotherTechnical & Environmental🟢 greenhigh✅ No
217ohc-homij-doormelding-regelkast-2024-12-19.pdfotherTechnical & Environmental🟢 greenhigh✅ No
218ohc-hoogendoorn-binnenbeplanting-18-en-20-2020-06-08.pdfotherTechnical & Environmental🟢 greenhigh✅ No
219ohc-leertouwer-inspektie-e-installatie-22-24-geb-a-2021-03-15.pdfotherTechnical & Environmental🟢 greenhigh✅ No
220ohc-leertouwer-so060745-3-290824-1306-2024-08-29.pdfotherTechnical & Environmental🟢 greenhigh✅ No
221ohc-securitas-keyholding-opvolging-nr-20-2025.pdfotherTechnical & Environmental🟢 greenhigh✅ No
222ohc-securitas-keyholding-opvolging-nr-22-24-2025.pdfotherTechnical & Environmental🟢 greenhigh✅ No
223ohc-securitas-uitbreiding-abonn-keyholding-opvolging-2025-2.pdfotherTechnical & Environmental🟢 greenhigh✅ No
224ohc-securitas-uitbreiding-abonn-keyholding-opvolging-2025.pdfotherTechnical & Environmental🟢 greenhigh✅ No
225ohc-teledatacom-22-24-abonn-simkaart-2020-10-19.pdfotherTechnical & Environmental🟢 greenhigh✅ No
226ohc-teledatacom-abonnement-gbs-sim-2021-01-21.pdfotherTechnical & Environmental🟢 greenhigh✅ No
227ohc-teledatacom-abonnement-simkaart-gbs-2021-12-09.pdfotherTechnical & Environmental🟢 greenhigh✅ No
228ohc-vebego-schoonmaakonderhoud-nr-20-2024-10-22.pdfotherTechnical & Environmental🟢 greenhigh✅ No
229ohc-vitens-contractbevestiging-aanmelding-water-2025-03-10 (1).pdfotherTechnical & Environmental🟢 greenhigh✅ No
230ohc-vitens-contractbevestiging-aanmelding-water-2025-03-10.pdfotherTechnical & Environmental🟢 greenhigh✅ No
231cert-2019-scios-abd656-rap-de-wel-20.pdfotherTechnical & Environmental🟢 greenhigh✅ No
232cert-2020-leertouwer-005079-oh-bmi-de-wel-18.pdfotherTechnical & Environmental🟢 greenhigh✅ No
233cert-2020-leertouwer-007930-oh-bmi-de-wel-18.pdfotherTechnical & Environmental🟢 greenhigh✅ No
234cert-2023-scios-abd655-de-wel-18.pdfotherTechnical & Environmental🟢 greenhigh✅ No
235cert-2023-scios-abd656-de-wel-20.pdfotherTechnical & Environmental🟢 greenhigh✅ No
236cert-2023-scios-bvn-aaa-19-de-wel-22-24.pdfotherTechnical & Environmental🟢 greenhigh✅ No
237cert-2023-scios-bvn-aaa-24-de-wel-18.pdfotherTechnical & Environmental🟢 greenhigh✅ No
238cert-2023-scios-bxu-aaa-40-de-wel-20.pdfotherTechnical & Environmental🟢 greenhigh✅ No
239cert-2025-leertouwer-030997-oh-bmi-de-wel-22-24.pdfotherTechnical & Environmental🟢 greenhigh✅ No
240cert-2025-scios-ejy-aaa-26-de-wel-22-24.pdfotherTechnical & Environmental🟢 greenhigh✅ No
241cert-2025-scios-ejy-aaa-27-de-wel-22-24.pdfotherTechnical & Environmental🟢 greenhigh✅ No
242fct-2020-ftc-brandveiligheid-de-wel-18-22.pdfotherTechnical & Environmental🟢 greenhigh✅ No
243info-herstelwerkzaamheden-vitens-de-wel-20-24.pdfotherTechnical & Environmental🟢 greenmedium✅ No
244pve-2021-leertouwer-bmi-oai-de-wel.pdfotherTechnical & Environmental🟢 greenhigh✅ No
245rap-2015-inspectie-onderhoudslijst-lbk-de-wel.pdfotherTechnical & Environmental🟢 greenhigh✅ No
246rap-2015-onderhoud-brandblussers-de-wel-18.pdfotherTechnical & Environmental🟢 greenhigh✅ No
247rap-2017-inspectie-onderhoudslijst-lbk-de-wel.pdfotherTechnical & Environmental🟢 greenhigh✅ No
248rap-2018-onderhoud-brandblussers-de-wel-18-24.pdfotherTechnical & Environmental🟢 greenhigh✅ No
249rap-2018-smeba-onderhoud-blusmiddelen-de-wel-18.pdfotherTechnical & Environmental🟢 greenhigh✅ No
250rap-2018-smeba-onderhoud-haspels-de-wel-18.pdfotherTechnical & Environmental🟢 greenhigh✅ No
251rap-2019-leertouwer-onderhoud-bmi-de-wel-18.pdfotherTechnical & Environmental🟢 greenhigh✅ No
252rap-2020-leertouwer-veiligheidsinspectie-de-wel-18.pdfotherTechnical & Environmental🟢 greenlow✅ No
253rap-2020-leertouwer-veiligheidsinspectie-de-wel-20.pdfotherTechnical & Environmental🟢 greenlow✅ No
254rap-2021-enegielive-monitoringsdienst-elektra-de-wel-18.pdfotherTechnical & Environmental🟢 greenhigh✅ No
255rap-2021-toetsingskader-eml-de-wel-18.pdfotherTechnical & Environmental🟢 greenhigh✅ No
256rap-2022-liftinstallatie-100300320-de-wel-20-2.pdfotherTechnical & Environmental🟢 greenhigh✅ No
257rap-2022-recro-gevelreiniging-de-wel-20.pdfotherTechnical & Environmental🟢 greenhigh✅ No
258rap-2024-liftinstallatie-387101601-de-wel-18.pdfotherTechnical & Environmental🟢 greenhigh✅ No
259rap-2025-energysafe-q1-de-wel-20.pdfotherTechnical & Environmental🟢 greenhigh✅ No
260rap-2025-eurosafe-rie-pva-tekening-de-wel-18-24.pdfotherTechnical & Environmental🟢 greenmedium✅ No
261rap-2025-scios-technische-installaties-de-wel-22.pdfotherTechnical & Environmental🟢 greenhigh✅ No
262rap-nen3140-herstelpunten-de-wel.pdfotherTechnical & Environmental🟢 greenhigh✅ No
263woz-2025-aanslag-de-wel-18-22-hoevelaken.pdfothergeneral🟢 greenlow✅ No
264akte-2006-akte-van-levering-de-wel-18-22-hoevelaken.pdfotherLegal & Title🟢 greenlow✅ No
265verg-2003-bouwtekeningen-fiesten-en-containerstallingen.pdfotherLegal & Title🟢 greenlow✅ No
266verg-bouwtekening-de-wel-18-22-hoevelaken.pdfotherLegal & Title🟢 greenlow✅ No
267bg-2020-amendment-no-2-ge-healthcare-de-wel-18.pdfotherContractual & Lease🟢 greenlow✅ No
268bg-2020-incl-amendment-no-1-ge-healthcare-de-wel-18.pdfotherContractual & Lease🟢 greenlow✅ No
269bg-2025-amendment-no-3-ge-healthcare-de-wel-18.pdfotherContractual & Lease🟢 greenlow✅ No
270pvo-plaatsen-laadpalen-ge-healthcare-de-wel-18.pdfotherContractual & Lease🟢 greenlow✅ No
271rf-2019-ge-healthcare-de-wel-18.pdfotherContractual & Lease🟢 greenlow✅ No
272rf-sepa-bubbelkoning-de-wel-20-hoevelaken.pdfotherContractual & Lease🟢 greenlow✅ No
273pvo-d-oort-incl-fotos-de-wel-hoevelaken.pdfotherContractual & Lease🟢 greenlow✅ No
274rf-yourizon-de-wel-20-hoevelaken.pdfotherContractual & Lease🟢 greenlow✅ No
275bg-abnamro-orbusneich-hoevelaken.pdfotherContractual & Lease🟢 greenlow✅ No
276lijst-schr-plattegrond-noodverlichting-met-nummers.pdfotherTechnical & Environmental🟢 greenlow✅ No
277tek-2003-de-wel-noodverlichting-met-nummers.pdfotherTechnical & Environmental🟢 greenlow✅ No
278tek-2004-de-wel-terrein-5-1-28.pdfotherTechnical & Environmental🟢 greenlow✅ No
279tek-2004-de-wel-terrein-5-1-33.pdfotherTechnical & Environmental🟢 greenlow✅ No
280tek-2004-de-wel-terrein-5-1-34.pdfotherTechnical & Environmental🟢 greenlow✅ No
281tek-2004-de-wel-voor-en-achtergevel-doorsneden-a-5-1-21.pdfotherTechnical & Environmental🟢 greenlow✅ No
282tek-2004-de-wel-voor-en-achtergevel-doorsneden-a-5-1-26.pdfotherTechnical & Environmental🟢 greenlow✅ No
283tek-2004-de-wel-voor-en-achtergevel-doorsneden-a-5-1-45.pdfotherTechnical & Environmental🟢 greenlow✅ No
284tek-2004-de-wel-voor-en-achtergevel-doorsneden-b-5-1-36.pdfotherTechnical & Environmental🟢 greenlow✅ No
285tek-2004-de-wel-voor-en-achtergevel-doorsneden-c-5-1-41.pdfotherTechnical & Environmental🟢 greenlow✅ No
286tek-2004-de-wel-zijgevels-a-5-1-27.pdfotherTechnical & Environmental🟢 greenlow✅ No
287tek-2004-de-wel-zijgevels-a-5-1-46.pdfotherTechnical & Environmental🟢 greenlow✅ No
288tek-2004-de-wel-zijgevels-b-5-1-35.pdfotherTechnical & Environmental🟢 greenlow✅ No
289tek-2004-de-wel-zijgevels-c-5-1-40.pdfotherTechnical & Environmental🟢 greenlow✅ No
290tek-2006-de-wel-e-installatie-kl2-5-1-1.pdfotherTechnical & Environmental🟢 greenlow✅ No
291tek-2006-de-wel-e-installaties-1e-5-1-12.pdfotherTechnical & Environmental🟢 greenlow✅ No
292tek-2006-de-wel-e-installaties-2.pdfotherTechnical & Environmental🟢 greenlow✅ No
293tek-2006-de-wel-e-installaties-3.pdfotherTechnical & Environmental🟢 greenlow✅ No
294tek-2006-de-wel-e-installaties-3e-5-1-11.pdfotherTechnical & Environmental🟢 greenlow✅ No
295tek-2006-de-wel-e-installaties-bedieningsp.pdfotherTechnical & Environmental🟢 greenlow✅ No
296tek-2006-de-wel-e-installaties-blokschema-2.pdfotherTechnical & Environmental🟢 greenlow✅ No
297tek-2006-de-wel-e-installaties-blokschema-3.pdfotherTechnical & Environmental🟢 greenlow✅ No
298tek-2006-de-wel-e-installaties-blokschema.pdfotherTechnical & Environmental🟢 greenlow✅ No
299tek-2006-de-wel-e-installaties-cvz-5-1-18.pdfotherTechnical & Environmental🟢 greenlow✅ No
300tek-2006-de-wel-e-installaties-eib-kasten.pdfotherTechnical & Environmental🟢 greenlow✅ No
301tek-2006-de-wel-e-installaties-hkl-5-1-17.pdfotherTechnical & Environmental🟢 greenlow✅ No
302tek-2006-de-wel-e-installaties-l01-5-1-16.pdfotherTechnical & Environmental🟢 greenlow✅ No
303tek-2006-de-wel-e-installaties-tekeningen.pdfotherTechnical & Environmental🟢 greenlow✅ No
304tek-2006-de-wel-e-installaties.pdfotherTechnical & Environmental🟢 greenlow✅ No
305tek-2007-de-wel-luchtbehandeling-1e-5-1-3.pdfotherTechnical & Environmental🟢 greenlow✅ No
306tek-2007-de-wel-luchtbehandeling-1e-5-1-6.pdfotherTechnical & Environmental🟢 greenlow✅ No
307tek-2007-de-wel-luchtbehandeling-1e-5-1-9.pdfotherTechnical & Environmental🟢 greenlow✅ No
308tek-2007-de-wel-luchtbehandeling-2e (1).pdfotherTechnical & Environmental🟢 greenlow✅ No
309tek-2007-de-wel-luchtbehandeling-2e-5-1-8.pdfotherTechnical & Environmental🟢 greenlow✅ No
310tek-2007-de-wel-luchtbehandeling-2e.pdfotherTechnical & Environmental🟢 greenlow✅ No
311tek-2007-de-wel-luchtbehandeling-5-1-10.pdfotherTechnical & Environmental🟢 greenlow✅ No
312tek-2007-de-wel-luchtbehandeling-5-1-7.pdfotherTechnical & Environmental🟢 greenlow✅ No
313tek-2007-de-wel-luchtbehandeling.pdfotherTechnical & Environmental🟢 greenlow✅ No
314tek-2019-de-wel-indeling-1e.pdfotherTechnical & Environmental🟢 greenlow✅ No
315tek-2020-de-wel-regeltechnische-omschrijving.pdfotherTechnical & Environmental🟢 greenlow✅ No
316tek-2021-de-wel-18-revisie-regeltechniek-2e.pdfotherTechnical & Environmental🟢 greenlow✅ No
317tek-2021-de-wel-18-revisie-regeltechniek-bgg.pdfotherTechnical & Environmental🟢 greenlow✅ No
318tek-2021-de-wel-18-revisie-regeltechniek.pdfotherTechnical & Environmental🟢 greenlow✅ No
319tek-2021-de-wel-geluidsmeting-1e-2021-06-11.pdfotherTechnical & Environmental🟢 greenlow✅ No
320tek-2021-de-wel-geluidsmeting-2021-06-11.pdfotherTechnical & Environmental🟢 greenlow✅ No
321tek-2021-de-wel-geluidsmeting-2e-2021-06-11.pdfotherTechnical & Environmental🟢 greenlow✅ No
322tek-2021-de-wel-geluidsmeting-3e-2021-06-11.pdfotherTechnical & Environmental🟢 greenlow✅ No
323tek-de-wel-doorsnede-a-a-5-1-60.pdfotherTechnical & Environmental🟢 greenlow✅ No
324tek-de-wel-terrein-5-1-61.pdfotherTechnical & Environmental🟢 greenlow✅ No
325brf-2019-bouwmeester-opzeggingen.pdfotherTechnical & Environmental🟢 greenlow✅ No
326ohc-dakbehoud-2019-04-09-nr-20.pdfotherTechnical & Environmental🟢 greenlow✅ No
327ohc-dakbehoud-2019-04-09-nr-22-24.pdfotherTechnical & Environmental🟢 greenlow✅ No
328ohc-dakonderhoud-2019-04-09-nr-18.pdfotherTechnical & Environmental🟢 greenlow✅ No
329ohc-flora-nova-2019-04-09.pdfotherTechnical & Environmental🟢 greenlow✅ No
330ohc-flora-nova-gladheidsbestrijding-2019-11-05.pdfotherTechnical & Environmental🟢 greenlow✅ No
331ohc-hago-2019-06-20.pdfotherTechnical & Environmental🟢 greenlow✅ No
332ohc-hago-glasbewassing-hago-2019-06-20-2.pdfotherTechnical & Environmental🟢 greenlow✅ No
333ohc-hago-glasbewassing-hago-2019-06-20.pdfotherTechnical & Environmental🟢 greenlow✅ No
334ohc-hago-schoonmaak-2019-06-20.pdfotherTechnical & Environmental🟢 greenlow✅ No
335ohc-kenter-2019-07-11.pdfotherTechnical & Environmental🟢 greenlow✅ No
336ohc-liander-2019-06-27-nr-18.pdfotherTechnical & Environmental🟢 greenlow✅ No
337ohc-liander-ato-22-24-elektra-2020-03-30.pdfotherTechnical & Environmental🟢 greenlow✅ No
338ohc-liander-getekende-netbebeheer-2020-03-30.pdfotherTechnical & Environmental🟢 greenlow✅ No
339ohc-matex-deuren-2019-07-04.pdfotherTechnical & Environmental🟢 greenlow✅ No
340ohc-matex-deuren-oh-overheaddeuren-2019-04-25-nr-20.pdfotherTechnical & Environmental🟢 greenlow✅ No
341ohc-matex-deuren-oh-overheaddeuren-2019-04-25-nr-22-24.pdfotherTechnical & Environmental🟢 greenlow✅ No
342ohc-msn-vuilafvoer-2021-09-13.pdfotherTechnical & Environmental🟢 greenlow✅ No
343ohc-securitas-abonnement-keyholding-2019-07-29.pdfotherTechnical & Environmental🟢 greenlow✅ No
344ohc-skylift-2019-04-25-2.pdfotherTechnical & Environmental🟢 greenlow✅ No
345ohc-skylift-2019-04-25-3.pdfotherTechnical & Environmental🟢 greenlow✅ No
346ohc-skylift-2019-04-25.pdfotherTechnical & Environmental🟢 greenlow✅ No
347ohc-succlean-glasbewassing-2-x-pj-2024-11-07.pdfotherTechnical & Environmental🟢 greenlow✅ No
348ohc-succlean-glasbewassing-22-24-4-xpj-2024-11-07.pdfotherTechnical & Environmental🟢 greenlow✅ No
349ohc-succlean-glasbewassing-4-x-pj-2024-11-07.pdfotherTechnical & Environmental🟢 greenlow✅ No
350ohc-teledatacom-ab-simkaart-bmi-2019-08-22-2.pdfotherTechnical & Environmental🟢 greenlow✅ No
351ohc-teledatacom-ab-simkaart-bmi-2019-08-22.pdfotherTechnical & Environmental🟢 greenlow✅ No
352ohc-trigion-abonnement-meldkamer-2019-06-19.pdfotherTechnical & Environmental🟢 greenlow✅ No
353ohc-trigion-alarmcentrale-2019-07-04.pdfotherTechnical & Environmental🟢 greenlow✅ No
354ohc-trigion-meldkamer-nr-18-2019-11-13.pdfotherTechnical & Environmental🟢 greenlow✅ No
355ohc-trigion-meldkamer-nr-18-2019-12-03-get.pdfotherTechnical & Environmental🟢 greenlow✅ No
356ohc-van-rijn-blusmiddelen-2019-04-25-2.pdfotherTechnical & Environmental🟢 greenlow✅ No
357ohc-van-rijn-blusmiddelen-2019-04-25.pdfotherTechnical & Environmental🟢 greenlow✅ No
358ohc-van-rijn-getekend-2019-07-17.pdfotherTechnical & Environmental🟢 greenlow✅ No
359ohc-van-rijn-noodverlichting-2019-04-25-2.pdfotherTechnical & Environmental🟢 greenlow✅ No
360ohc-van-rijn-noodverlichting-2019-04-25.pdfotherTechnical & Environmental🟢 greenlow✅ No
361ohc-vebego-schoonmaakonderhoud-22-24-2024-10-29.pdfotherTechnical & Environmental🟢 greenlow✅ No
362ohc-vebego-schoonmaakonderhoud-nr-18-2024-11-12.pdfotherTechnical & Environmental🟢 greenlow✅ No
363ohc-vebego-schoonmaakonderhoud-nr-22-24-2024-02-14.pdfotherTechnical & Environmental🟢 greenlow✅ No
364cert-2019-sleutelcertificaat-de-wel.pdfotherTechnical & Environmental🟢 greenlow✅ No
365pve-2018-bmi-oai-de-wel-18.pdfotherTechnical & Environmental🟢 greenlow✅ No
366pve-2018-bmi-oai-de-wel.pdfotherTechnical & Environmental🟢 greenlow✅ No
367rap-2015-leertouwer-onderhoud-bmi-oai-de-wel.pdfotherTechnical & Environmental🟢 greenlow✅ No
368rap-2016-gebreken-algemeen-de-wel-20.PDFotherTechnical & Environmental🟢 greenlow✅ No
369rap-2016-gebreken-bosch-de-wel-22-24.pdfotherTechnical & Environmental🟢 greenlow✅ No
370rap-2016-gebreken-ge-healthcare-de-wel-18.pdfotherTechnical & Environmental🟢 greenlow✅ No
371rap-2016-hormann-onderhoud-de-wel-20.pdfotherTechnical & Environmental🟢 greenlow✅ No
372rap-2017-groepenverklaringen-de-wel-20.pdfotherTechnical & Environmental🟢 greenlow✅ No
373rap-2017-leertouwer-onderhoud-de-wel-18.pdfotherTechnical & Environmental🟢 greenlow✅ No
374rap-2017-leertouwer-onderhoud-de-wel-20.pdfotherTechnical & Environmental🟢 greenlow✅ No
375rap-2017-onderhoud-brandblussers-de-wel-18.pdfotherTechnical & Environmental🟢 greenlow✅ No
376sv-2022-sleutelverklaring-ans-de-wijn-de-wel-18-24.pdfotherTechnical & Environmental🟢 greenlow✅ No
377sv-2022-sleutelverklaring-mvgm-de-wel-18-24.pdfotherTechnical & Environmental🟢 greenlow✅ No
378sv-2023-sleutelverklaring-about-projects-de-wel-18-24.pdfotherTechnical & Environmental🟢 greenlow✅ No
379foto-de-wel-18-22-reddstone-1.jpgothergeneral🟢 greenlow✅ No
380foto-de-wel-18-22-reddstone-100.jpgothergeneral🟢 greenlow✅ No
381foto-de-wel-18-22-reddstone-101.jpgothergeneral🟢 greenlow✅ No
382foto-de-wel-18-22-reddstone-2.jpgothergeneral🟢 greenlow✅ No
383foto-de-wel-18-22-reddstone-3.jpgothergeneral🟢 greenlow✅ No
384foto-de-wel-18-22-reddstone-34.jpgothergeneral🟢 greenlow✅ No
385foto-de-wel-18-22-reddstone-35.jpgothergeneral🟢 greenlow✅ No
386foto-de-wel-18-22-reddstone-36.jpgothergeneral🟢 greenlow✅ No
387foto-de-wel-18-22-reddstone-37.jpgothergeneral🟢 greenlow✅ No
388foto-de-wel-18-22-reddstone-38.jpgothergeneral🟢 greenlow✅ No
389foto-de-wel-18-22-reddstone-39.jpgothergeneral🟢 greenlow✅ No
390foto-de-wel-18-22-reddstone-4.jpgothergeneral🟢 greenlow✅ No
391foto-de-wel-18-22-reddstone-40.jpgothergeneral🟢 greenlow✅ No
392foto-de-wel-18-22-reddstone-41.jpgothergeneral🟢 greenlow✅ No
393foto-de-wel-18-22-reddstone-42.jpgothergeneral🟢 greenlow✅ No
394foto-de-wel-18-22-reddstone-43.jpgothergeneral🟢 greenlow✅ No
395foto-de-wel-18-22-reddstone-44.jpgothergeneral🟢 greenlow✅ No
396foto-de-wel-18-22-reddstone-45.jpgothergeneral🟢 greenlow✅ No
397foto-de-wel-18-22-reddstone-46.jpgothergeneral🟢 greenlow✅ No
398foto-de-wel-18-22-reddstone-47.jpgothergeneral🟢 greenlow✅ No
399foto-de-wel-18-22-reddstone-48.jpgothergeneral🟢 greenlow✅ No
400foto-de-wel-18-22-reddstone-49.jpgothergeneral🟢 greenlow✅ No
401foto-de-wel-18-22-reddstone-5.jpgothergeneral🟢 greenlow✅ No
402foto-de-wel-18-22-reddstone-50.jpgothergeneral🟢 greenlow✅ No
403foto-de-wel-18-22-reddstone-51.jpgothergeneral🟢 greenlow✅ No
404foto-de-wel-18-22-reddstone-52.jpgothergeneral🟢 greenlow✅ No
405foto-de-wel-18-22-reddstone-53.jpgothergeneral🟢 greenlow✅ No
406foto-de-wel-18-22-reddstone-54.jpgothergeneral🟢 greenlow✅ No
407foto-de-wel-18-22-reddstone-55.jpgothergeneral🟢 greenlow✅ No
408foto-de-wel-18-22-reddstone-56.jpgothergeneral🟢 greenlow✅ No
409foto-de-wel-18-22-reddstone-57.jpgothergeneral🟢 greenlow✅ No
410foto-de-wel-18-22-reddstone-58.jpgothergeneral🟢 greenlow✅ No
411foto-de-wel-18-22-reddstone-59.jpgothergeneral🟢 greenlow✅ No
412foto-de-wel-18-22-reddstone-6.jpgothergeneral🟢 greenlow✅ No
413foto-de-wel-18-22-reddstone-60.jpgothergeneral🟢 greenlow✅ No
414foto-de-wel-18-22-reddstone-61.jpgothergeneral🟢 greenlow✅ No
415foto-de-wel-18-22-reddstone-62.jpgothergeneral🟢 greenlow✅ No
416foto-de-wel-18-22-reddstone-63.jpgothergeneral🟢 greenlow✅ No
417foto-de-wel-18-22-reddstone-64.jpgothergeneral🟢 greenlow✅ No
418foto-de-wel-18-22-reddstone-65.jpgothergeneral🟢 greenlow✅ No
419foto-de-wel-18-22-reddstone-66.jpgothergeneral🟢 greenlow✅ No
420foto-de-wel-18-22-reddstone-67.jpgothergeneral🟢 greenlow✅ No
421foto-de-wel-18-22-reddstone-68.jpgothergeneral🟢 greenlow✅ No
422foto-de-wel-18-22-reddstone-69.jpgothergeneral🟢 greenlow✅ No
423foto-de-wel-18-22-reddstone-7.jpgothergeneral🟢 greenlow✅ No
424foto-de-wel-18-22-reddstone-70.jpgothergeneral🟢 greenlow✅ No
425foto-de-wel-18-22-reddstone-71.jpgothergeneral🟢 greenlow✅ No
426foto-de-wel-18-22-reddstone-72.jpgothergeneral🟢 greenlow✅ No
427foto-de-wel-18-22-reddstone-73.jpgothergeneral🟢 greenlow✅ No
428foto-de-wel-18-22-reddstone-74.jpgothergeneral🟢 greenlow✅ No
429foto-de-wel-18-22-reddstone-75.jpgothergeneral🟢 greenlow✅ No
430foto-de-wel-18-22-reddstone-76.jpgothergeneral🟢 greenlow✅ No
431foto-de-wel-18-22-reddstone-77.jpgothergeneral🟢 greenlow✅ No
432foto-de-wel-18-22-reddstone-78.jpgothergeneral🟢 greenlow✅ No
433foto-de-wel-18-22-reddstone-79.jpgothergeneral🟢 greenlow✅ No
434foto-de-wel-18-22-reddstone-80.jpgothergeneral🟢 greenlow✅ No
435foto-de-wel-18-22-reddstone-81.jpgothergeneral🟢 greenlow✅ No
436foto-de-wel-18-22-reddstone-82.jpgothergeneral🟢 greenlow✅ No
437foto-de-wel-18-22-reddstone-83.jpgothergeneral🟢 greenlow✅ No
438foto-de-wel-18-22-reddstone-84.jpgothergeneral🟢 greenlow✅ No
439foto-de-wel-18-22-reddstone-85.jpgothergeneral🟢 greenlow✅ No
440foto-de-wel-18-22-reddstone-86.jpgothergeneral🟢 greenlow✅ No
441foto-de-wel-18-22-reddstone-87.jpgothergeneral🟢 greenlow✅ No
442foto-de-wel-18-22-reddstone-88.jpgothergeneral🟢 greenlow✅ No
443foto-de-wel-18-22-reddstone-89.jpgothergeneral🟢 greenlow✅ No
444foto-de-wel-18-22-reddstone-90.jpgothergeneral🟢 greenlow✅ No
445foto-de-wel-18-22-reddstone-91.jpgothergeneral🟢 greenlow✅ No
446foto-de-wel-18-22-reddstone-92.jpgothergeneral🟢 greenlow✅ No
447foto-de-wel-18-22-reddstone-93.jpgothergeneral🟢 greenlow✅ No
448foto-de-wel-18-22-reddstone-94.jpgothergeneral🟢 greenlow✅ No
449foto-de-wel-18-22-reddstone-95.jpgothergeneral🟢 greenlow✅ No
450foto-de-wel-18-22-reddstone-96.jpgothergeneral🟢 greenlow✅ No
451foto-de-wel-18-22-reddstone-97.jpgothergeneral🟢 greenlow✅ No
452foto-de-wel-18-22-reddstone-98.jpgothergeneral🟢 greenlow✅ No
453foto-de-wel-18-22-reddstone-99.jpgothergeneral🟢 greenlow✅ No
454foto-drone-de-wel-18-22-hoevelaken-40.jpgothergeneral🟢 greenlow✅ No
455foto-drone-de-wel-18-22-hoevelaken-41.jpgothergeneral🟢 greenlow✅ No
456foto-drone-de-wel-18-22-hoevelaken-42.jpgothergeneral🟢 greenlow✅ No
457foto-drone-de-wel-18-22-hoevelaken-43.jpgothergeneral🟢 greenlow✅ No
458foto-drone-de-wel-18-22-hoevelaken-44.jpgothergeneral🟢 greenlow✅ No
459foto-drone-de-wel-18-22-hoevelaken-45.jpgothergeneral🟢 greenlow✅ No
460foto-drone-de-wel-18-22-hoevelaken-46.jpgothergeneral🟢 greenlow✅ No
461foto-drone-de-wel-18-22-hoevelaken-47.jpgothergeneral🟢 greenlow✅ No
462foto-drone-de-wel-18-22-hoevelaken-48.jpgothergeneral🟢 greenlow✅ No
463foto-drone-de-wel-18-22-hoevelaken-49.jpgothergeneral🟢 greenlow✅ No
464foto-drone-de-wel-18-22-hoevelaken-50.jpgothergeneral🟢 greenlow✅ No
465foto-drone-de-wel-18-22-hoevelaken-51.jpgothergeneral🟢 greenlow✅ No
466ohc-vitens-water-op-juiste-tns-2025-02-11.jpgotherTechnical & Environmental🟢 greenlow✅ No
467plot.logotherTechnical & Environmental🟢 greenlow✅ No
468w1-00-tm-w1-03-00-18-gebouw-a.dwgotherTechnical & Environmental🟢 greenlow✅ No
469w2-01-tm-w2-02-00-18-gebouw-a.dwgotherTechnical & Environmental🟢 greenlow✅ No
470w5-02a-00-18-gebouw-a.dwgotherTechnical & Environmental🟢 greenlow✅ No
471w6-00a-00-18-gebouw-a.dwgotherTechnical & Environmental🟢 greenlow✅ No
472w6-01a-00-18-gebouw-a.dwgotherTechnical & Environmental🟢 greenlow✅ No
473w6-02a-00-18-gebouw-a.dwgotherTechnical & Environmental🟢 greenlow✅ No
474xp01-00-18-gebouw-a.dwgotherTechnical & Environmental🟢 greenlow✅ No
475xp11-00-18-gebouw-a.dwgotherTechnical & Environmental🟢 greenlow✅ No
476xp21-00-18-gebouw-a.dwgotherTechnical & Environmental🟢 greenlow✅ No
477acad-w1-00-tm-w1-03-00-18-gebouw-b.bakotherTechnical & Environmental🟢 greenlow✅ No
478acad-w1-00-tm-w1-03-00-18-gebouw-b.dwgotherTechnical & Environmental🟢 greenlow✅ No
479w1-00-tm-w1-03-00-18-gebouw-b.dwgotherTechnical & Environmental🟢 greenlow✅ No
480acad.ctbotherTechnical & Environmental🟢 greenlow✅ No
481plot.logotherTechnical & Environmental🟢 greenlow✅ No
482w1-00-tm-w1-03-00-18-gebouw-b.dwgotherTechnical & Environmental🟢 greenlow✅ No
483w1-00-tm-w1-03-00-18-gebouw-b.txtotherTechnical & Environmental🟢 greenlow✅ No
484w2-01-tm-w2-02-00-18-gebouw-b.dwgotherTechnical & Environmental🟢 greenlow✅ No
485w5-02b-00-18-gebouw-b.dwgotherTechnical & Environmental🟢 greenlow✅ No
486w6-00b-00-18.dwgotherTechnical & Environmental🟢 greenlow✅ No
487w6-01b-00-18-gebouw-b.dwgotherTechnical & Environmental🟢 greenlow✅ No
488plafond.zipotherTechnical & Environmental🟢 greenlow✅ No
489plot.logotherTechnical & Environmental🟢 greenlow✅ No
490w1-00-tm-w1-03-00-18-gebouw-c.dwgotherTechnical & Environmental🟢 greenlow✅ No
491w2-01-tm-w2-02-00-18-gebouw-c.dwgotherTechnical & Environmental🟢 greenlow✅ No
492w5-02c-00-18-gebouw-c.dwgotherTechnical & Environmental🟢 greenlow✅ No
493w6-00c-00-18-gebouw-c.dwgotherTechnical & Environmental🟢 greenlow✅ No
494w6-01c-00-18-gebouw-c.dwgotherTechnical & Environmental🟢 greenlow✅ No
495w6-02c-00-18-gebouw-c.dwgotherTechnical & Environmental🟢 greenlow✅ No
496plot.logotherTechnical & Environmental🟢 greenlow✅ No
497w0-01-00-18.dwgotherTechnical & Environmental🟢 greenlow✅ No
498w1-00b-w1-03b-00-18.dwgotherTechnical & Environmental🟢 greenlow✅ No
499w2-01-tm-w2-02-00-18-gebouw-b.dwgotherTechnical & Environmental🟢 greenlow✅ No
500w6-00b-00-18.dwgotherTechnical & Environmental🟢 greenlow✅ No
501w6-01b-00-18.dwgotherTechnical & Environmental🟢 greenlow✅ No
502w6-02a-00-18-gebouw-a.dwgotherTechnical & Environmental🟢 greenlow✅ No
503w6-02b-00-18.dwgotherTechnical & Environmental🟢 greenlow✅ No
504w6-02c-00-18.dwgotherTechnical & Environmental🟢 greenlow✅ No
505w8-01-00-18.dwgotherTechnical & Environmental🟢 greenlow✅ No
506w9-01-00-18.dwgotherTechnical & Environmental🟢 greenlow✅ No
507w9-02-00-18.dwgotherTechnical & Environmental🟢 greenlow✅ No
508mail-2021-skylift-wijziging-contract-ivm-stilstaande-lift.msgotherTechnical & Environmental🟢 greenlow✅ No
509ohc-energysafe-uitbreiding-energiemonitoring-3-x-2025-03-20.msgotherTechnical & Environmental🟢 greenlow✅ No
510rap-2021-18-bediening-ruimte-thermostaat-de-wel.docxotherTechnical & Environmental🟢 greenlow✅ No

12. Appendices

A. Methodology

This due diligence report was prepared using Vesper AI's Tier 1 intelligence engine (v3.0), featuring document-type-specific extraction schemas, cross-document reconciliation, contradiction detection, and financial materiality scoring. Each document is classified into one of 11 document types, analyzed with type-specific prompts, and then cross-referenced against the entire corpus to detect inconsistencies.

The multi-stage executive summary synthesizes findings through three passes: per-category summaries, cross-category analysis incorporating reconciliation findings, and final strategic synthesis. This approach prevents context overflow and produces institutional-grade analysis suitable for Big Four standards.

All 510 documents were ingested, classified, and analyzed. Of these, 262 received full AI analysis, while 248 were classified but not analyzed in detail. Supported formats: PDF, DOCX, XLSX, CSV, TXT.

B. Scoring Criteria

Score RangeGradeInterpretation
90–100A+Excellent — minimal risk, proceed with confidence
80–89AGood — low risk, standard precautions
70–79BSatisfactory — moderate risk, targeted follow-up needed
60–69CBelow average — elevated risk, significant review required
50–59DPoor — high risk, major concerns must be addressed
0–49FFail — critical risk, do not proceed without resolution

C. Risk Level Definitions

LevelIndicatorDefinition
Green (Low)🟢No material issues identified. Standard monitoring recommended.
Amber (Medium)🟡Issues identified that require attention but are manageable.
Red (High)🔴Critical issues that pose significant risk. Must be resolved before proceeding.

D. Materiality Thresholds

LevelThresholdAction Required
Negligible< 0.1% of transaction valueNote for record, no action required
Notable0.1% – 1% of transaction valueMonitor and address during negotiations
Material1% – 5% of transaction valueMust be resolved or priced into transaction
Critical> 5% of transaction valueTransaction blocker — resolution mandatory

E. Category Weights

CategoryWeightRationale
Legal & Title25%Fundamental to ownership transfer and transaction validity
Financial & Valuation25%Core investment metrics and value assessment
Technical & Environmental15%Physical condition and environmental liability
Contractual & Lease15%Income security and tenant relationships
Permits & Compliance10%Regulatory approvals and ongoing compliance
KYC & AML5%Counterparty verification
Commercial & Market5%Market positioning and competitive analysis

F. Disclaimer & Limitations

This report has been generated by Vesper AI's Tier 1 automated intelligence engine and is provided for informational purposes only. While every effort has been made to ensure accuracy, this report should not be considered a substitute for professional legal, financial, or technical advice.

The analysis is based solely on documents provided in the data room as of the processing date. Vesper AI makes no representations or warranties regarding the completeness or accuracy of the source documents.55 documents have been flagged for manual review.

This report is classified as CONFIDENTIAL and is intended solely for the use of the addressee. Unauthorized distribution is prohibited.

© 2026 Vesper AI. All rights reserved.